BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Renovation of a transportation facility in East Alton, Illinois. Completed plans call for the renovation of a 700-square-foot transportation facility.

Reference Number 0000379742 The St. Louis Regional Airport Authority ("Authority") is seeking proposals from qualified contractors ("Contractor") with experience in conducting roof inspections, repairs, and entire roof replacements. The Contractor shall also be licensed and insured for conducting business within Illinois. The Contractor shall have previous experience working with membrane roofing materials. The Authority owns an approximately 700 square foot metal awning structure over a walkway with a flat roof. The existing roof contains gravel material sitting on steel decking. Recent inspection has found the existing roof material in need of removal and replacement. The roofing material that ties this structure into the main building structure also needs repaired/replaced. This building located at 8 Terminal Drive East Alton, IL 62024. It is estimated the roof is original to the facility. The project will include removal of all existing material and installation of a new membrane roof installation on this portion of the facility. This RFP is intended to create a fair and reasonable method for obtaining responses from interested parties. By issuing this RFP, the Authority is not obligated to enter into an agreement with any of the interested consultants. The Authority reserves the right to accept or reject any and all proposals submitted and to waive any and/or all irregularities pertaining to the submission of proposals. Prevailing wage must be included in any provided proposal along with itemized breakdown of services. The selected Contractor must be licensed to perform this work. Scope of Services St. Louis Regional Airport will look for the Contractor to provide services to include, but not limited to: Evaluation of existing roof Identification of membrane product for replacement Removal of all existing roofing materials Installation of new membrane roofing material using adhesive. This structure is exposed on the bottom so the use of mechanical fasteners shall not be used Repairs at locations where this roofing structure ties into the existing main structure Compliance with all applicable federal, state, and local regulations Question Deadline 04/02/2025 at 2:00 PM CT All questions can be directed to Danny Adams, Airport Director, at the contact information Airport Director 618-259-2531 dadams@stlouisregional.com Questions are submitted online No General Requirements - Contractors License Required - Insurance Required - Prevailing Wage Required - Warranty Information Required This RFP is intended to create a fair and reasonable method for obtaining responses from interested parties. By issuing this RFP, the Authority is not obligated to enter into an agreement with any of the interested consultants. The Authority reserves the right to accept or reject any and all proposals submitted and to waive any and/or all irregularities pertaining to the submission of proposals. Prevailing wage must be included in any provided proposal along with itemized breakdown of services. The selected Contractor must be licensed to perform this work.

Award

Transportation Terminals

$16,500.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
93
Bidding Soon
1,394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 5, 2025

Project location map

8 Terminal Dr, East Alton, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.