BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2024 at 8:00 PM

Updated October 30, 2024

Renovation of a playground / park / athletic field in Wichita, Kansas. Completed plans call for the renovation of a playground / park / athletic field.

The City of Wichita requests the installation of downtown restrooms and a hydration station. Question Deadline 10/16/2024 at 12:00 PM CT Online Portal Each Portland Loo product and services shall contain the following: - Single occupant public toilet. 304 stainless steel posts, panels, louvers, roof and toilet. Aluminum front door. Skylight, 40W heat trace, interior & exterior LED lighting with photoeye and motion sensor control and occupancy counter. Incl. interior 32oz hand sanitizer dispenser and lockable 2-roll toilet paper dispenser with AC power option. LH/RH door swing to be determined later. - Loo Template - Foundation Mounting Hardware - As-Built Drawings - Baby Changing Table - Trash Can - Cold Weather Toilet Upgrade - Recessed Hand Wash With Cold Air Hand Dryer, Tempered Water, and Soap Dispenser Shipping & handling of the two restrooms shall be in one load.

Post-Bid

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Renovation

16

18

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
33
Bidding Soon
305
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

November 18, 2024

Project location map

Multiple Locations, Wichita, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.