BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2024 at 8:00 PM

Updated October 25, 2024

Site work and paving for a mixed-use development in Milan, New Mexico. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and bridge / tunnel.

Stanley Road Bridge and Pedestrian Bridge Improvements Project Construction of a new road and pedestrian bridge in Milan, NM. Pedestrian bridge replacement, channel grading, utilities, earthwork, site work, curb & gutter, concrete & asphalt paving, drainage improvements, erosion control, signing, striping, traffic control, and miscellaneous construction as needed. 180 Calendar Days to Substantial; 210 Calendar Days to Final At this time NMDOT will meet the State DBE on Federally assisted projects through a combination of race-neutral and race-conscious measures. This project is subject to race-conscious measures. The established DBE goal for this project is 0.00%. The Bidders Bid Guaranty shall be five percent (5%) of the Bidders Total Bid Amount and that be submitted before Bid Opening. The Wage of Milan reserves the hght to reject any or al bids in part or in whole. Bid packets are mailable by contacting Any bid received after this deadline will not be considered. Bids may be held for sixty (60) days subject to action by the Village of Milan. The Village of Milan reserves the right to reject any or all bids in part or in whole. Bid packets are available by contacting:

Award

Bridges / Tunnels

$2,324,524.00

Public - City

Paving, Site Work

37

7

43

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
15
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

Project location map

Stanley Rd, Milan, NM


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.