BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2025 at 8:00 PM

Updated March 23, 2025

Site work, paving and renovation of a mixed-use development in Alamosa, Colorado. Completed plans call for site work for a transportation facility; and for the renovation of a retail development.

Issue deadline for questions or clarification requests. Questions or clarification requests must be submitted no later than Wednesday, October 10, 2024, by 4:00 p.m. (MDT) via email to Ronda Lucero at rlucero@usbr.gov. SLV-CB SHOP FLOOR AND APRON REPAIR The slab on the right side of the Alamosa shop building needs to be removed and replaced, an estimated 800-ft2 area and 18-inch-thick slab. The vault in the middle of the slab can either be removed or left in place; either way the open space would be filled and compacted. The vault dimensions are 26.25 ft. long x 3.4 ft. wide x 5.2 ft. deep (464 ft3 ). To prevent future moisture accumulation that could lead to another damaging freeze-thaw effect, a subsurface drain to draw water away from the shop foundation could be installed. Also recommended is to improve the overall drainage scheme of the paved areas around the shop building. This could include removing the drain at the disused wash bay and paving it over and repaving other areas so that runoff flows away from high traffic areas where it could otherwise freeze over and become a hazard. There are existing drains in the gravel parking lot area that the new drainage scheme can flow to. The heaving area outside the north entrance of the shop will need to be removed and replaced. The perimeter sidewalks will need to be repaired or replaced along with deteriorating sidewalk aprons. Location and Hours of Operations The Reclamation's facility is located at 10900 Highway 160 East, Alamosa, Colorado 81101 in Alamosa County at Latitude 37o 28' 22.3" and Longitude 105o 50' 32.1". Alamosa Field Division facility is approximately 1.7 miles northeast of downtown Alamosa, Colorado on US Highway 160. Reclamation's standard business hours are Monday through Friday from 07:30 AM to 4:00 PM MDT except Federal Holidays. Reclamation is a smoke, drug, and alcohol-free facility. MAGNITUDE OF CONSTRUCTION PROJECT: In accordance with Federal Acquisition Regulation (FAR), Disclosure of the Magnitude of Construction FAR 36.204(b) is estimated to be between $25,000 and $100,000. Period of Performance: 11/25/2024 to 02/24/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$64,471.00

Public - Federal

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
5
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 1, 2024

Project location map

10900 US-160, Alamosa, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.