Site work for a sidewalk / parking lot in Somerville, Massachusetts. Completed plans call for site work for a sidewalk / parking lot.

Pre-Cast Concrete Curb Procurement and Installation. Estimated Construction Cost $175,000 QUESTIONS DUE (for Addendum 1): 10/02/2024 by 5:00 PM EST Questions concerning this solicitation must be delivered in writing to: Andrea Caruth Deputy Chief Procurement Officer Somerville City Hall Procurement & Contracting Services Department 93 Highland Avenue Somerville, MA 02143 Or emailed to: procurement@somervillema.gov Or faxed to: 617-625-1344 Project: Pre-Cast Concrete Curb Procurement and Installation Scope: Furnish and install pre-cast concrete curbs with flex posts on Washington St, Medford St, and Curtis St. Quantity: Approximately 270 total units of curb. 195 units on Washington St, 50 units on Medford St, 25 units on Curtis St. Specifications: The Contractor shall furnish and install all Precast Concrete Bike Lane Separators anchored at the locations shown on the plans. Precast Concrete Bike Lane Separators shall be made of Portland cement concrete and reinforcing steel cast in rigid molds. Concrete shall be 5000 psi with air entrained 5-7%. The finished units shall be uniform in shape, size finish and color. Reinforcing steel shall conform to ASTM A615 deformed steel bars and placed with 2" cover. Anchorage pins shall be No. 7 reinforcing steel with a minimum length of 22 inches, with two pins per unit. Shop drawings shall be obtained by contractor and approved by Project Manager prior to purchase of curb. Flexible delineator posts shall be considered incidental to the cost of the unit. Layout will be performed by contractor and approved by Project Manager prior to installation of curb. Precast Concrete Bike Lane Separators will be measured by each unit installed, complete in place. Precast Concrete Bike Lane Separators will be paid at the contract unity price per each, which shall be full compensation for all labor, materials, equipment, and incidentals required to complete the work.

Post-Bid

Sidewalks / Parking Lot

$175,000.00

Public - City

Site Work

7

12

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
193
Bidding Soon
2,698
All Active Projects
1,218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 6, 2024

img_map_placeholder

To Be Determined, Somerville, MA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.