BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Groton, Connecticut. Completed plans call for the renovation of a municipal facility.

The City of Groton (the "City") is seeking proposals from qualified and experienced electrical contracting firms to provide services for the electrical switchgear replacement project. The City of Groton (the "City") is seeking proposals from qualified and experienced electrical contracting firms to provide services for the electrical switchgear replacement project (the "Project"). Background and Project Intent The main G.E. electrical switchgear at the Municipal Building is original to 1964 and in need of replacement. The switchgear is rated at 208/120vac and 4,000 amps, 4 wire w/ isolated ground. There are no motor starters; all loads are via fused disconnects. Existing disconnects ratings include the following (4) 600 amp three phase, (18) 200 amp three phase and (6) 100 amp three phase. There are several buss taps that will need to be transferred into the new equipment; (1) 800 amp three phase and (1) 600 amp three phase and (8) 100 amp three phase. Total recorded FLA has been recorded during heating season (electric heat) at 850 amperes. The G.E switchgear feeds the complete facility and is energized via a Russelectric closed transition ATS rated at 208/120vac and 3000amps. The Russelectric ATS has two electric sources; the local utility via an outdoor pad mount transformer and a 750kw/2500 amp standby generator. The project intent is to replace the existing G.E. switchgear with a new Main Distribution Panel. Capacity for the new MDP and distribution equipment should include future growth by the City. The location for the new MDP will be in the adjacent electrical room beside the ATS switch. The new MDP and additional equipment can be installed to allow transferring of loads to minimize impact to operations at the Municipal 2 Building via scheduled shutdowns. Once complete the old G.E. switchgear shall be removed. The project consists of installing new 208/120vac panels/load centers in the adjacent electrical room beside the Automatic Transfer Switch, transferring the existing loads from the G.E. switchgear over to the new equipment and removal of the original G.E. switchboard. Questions Regarding this project should be directed to William Robarge, 860-446- 4073, no later than October 16, 2024

Sub-Bidding

Municipal

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
201
Bidding Soon
2,854
All Active Projects
1,192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.