BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sierra Vista, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Sierra Vista is requesting bids from qualified Contractors for Martin Luther King Reconstruction Project (from Avenida Escuela to SR 90), 2025-IFB-012-PW276 to be received no later than Monday, October 28, 2024 at 10:00 am. All bids received after bid response deadline will not be accepted. This project includes tasks necessary to improve an approximate 1,370 linear foot section of Martin Luther King (MLK) Parkway within the City of Sierra Vista, Arizona. This project includes tasks necessary to improve an approximate 1,370 linear foot section of Martin Luther King (MLK) Parkway within the City of Sierra Vista Arizona (See Plans). The pavement (full depth) will be milled and replaced within the section of MLK between State Route 90 Bypass (at the ADOT ROW line) to the west end of the intersection with Avenida Escuela. The removal will also include about 1-inch of the subgrade materials which will all need to be hauled away from the project site. The pavement replacement will consist of 3-inches of asphaltic concrete (AC) over 10-inches of aggregate base course (ABC). In addition to the scope of work described above, the contractor will also be responsible for striping and restoring all utility frames to the new grade as well as the restoration of any existing survey monuments. During the construction of this project, it is noted that the Contractor will be responsible for notifications of construction to local businesses and residences. These tasks are more specifically outlined in Section 10 of these specifications. Work associated with this project shall be completed within 90 calendar days of written Notice to Proceed. It shall be the Contractor's responsibility to complete the work specified here within and supply any incidental services or accessories necessary to make the Question Submission Deadline:October 18, 2024, 5:00pm

Award

Roads / Highways

$893,270.00

Public - City

Paving, Site Work

19

3

4

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
8
Bidding Soon
120
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2024

November 27, 2024

img_map_placeholder

Avenida Escuela, Sierra Vista, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.