Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a mixed-use development in West Des Moines, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Construction of 1,125 feet of Grand Prairie Parkway from 500 feet south of Wendover Road to 625 feet north of Wendover Road and construction of the intersection with the future EP True Parkway including all materials, labor, and equipment necessary for installation of approximately: 390 LF of storm sewer with 10 structures, 410 LF of water main, 5,500 CY of grading, 9,175 SY of PCC pavement, 580 SY of doweled median, 1,620 CY of modified subbase, 270 SY of PCC sidewalk and shared use path, traffic signals, 2 ACRES of surface restoration, erosion control, pavement markings, traffic control, construction survey, and miscellaneous related work and appurtenances. The two construction phases of EP True Parkway from Grand Prairie Parkway to Wendover Lane are scheduled to be let in May, 2025 as well. This project will require coordination with both of those projects. All bids shall be made on the form furnished by the City through wdm.ionwave.net and shall be filed on or before the time specified above. Each proposal shall be electronically accompanied by a scanned copy of the bid bond or a scanned copy of a cashier's or certified check drawn on an Iowa bank or a bank chartered under the laws of the United States in an amount equal to ten percent (10%) of the total amount of the bid. If a bid bond is submitted it must be on the form provided with the contract documents. A physical copy of the bid security will be required to be submitted to the City Clerk's Office by the apparent low bidder within 48 hours of the bid deadline The successful bidder will be required to furnish a performance and payment bond in the amount of one hundred percent (100%) of the contract price guaranteeing faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract. Additionally the contractor must provide the City with a guarantee of maintenance of said improvement in the form of surety for a period of four (4) years from the time of acceptance by the City. Work on said project shall commence within ten (10) days of the written notice to proceed and shall be substantially completed by October 31, 2025. Substantial completion shall be defined as all utilities, traffic signal conduit systems and footings, grading, and pavement completed, with the streets and sidewalks fully open to traffic. Liquidated damages in the amount of One Thousand and 00/100 dollars ($1,000.00) per consecutive calendar day will be assessed for work not substantially completed within the designated Contract term(s). The work shall be fully completed by May 31, 2026. Full completion shall be defined as all improvements, including restoration, seeding, and a complete and functional traffic signal installation, and ready for final acceptance. Liquidated damages in the amount of One Thousand and 00/100 dollars ($1,000.00) per consecutive calendar day will be assessed for each day that the work remains uncompleted after the end of the contract period. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Question Deadline: 5/19/2025 02:00 PM (CT)

Award

Roads / Highways

$1,957,300.00

Public - City

Paving, Site Work

114

10

5

6

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
0
Bidding Soon
429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

July 21, 2025

Project location map

Multiple Locations, West Des Moines, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.