Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Site work and renovation of a civil project in Flemington, West Virginia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Question Deadline 10/23/2024-Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Project includes the following Work: Installation of a new UV disinfection system and effluent flow meter at the existing Wastewater Treatment Plant and to install a sewage grinder on the influent of the Wastewater Treatment Plant. The Work will be substantially completed within 180 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 210 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000 per day. A bidder may not withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to Town of Flemington in an amount equal to five percent (5%) of the base bid.

Award

Water / Sewer

$312,022.00

Public - City

Renovation, Site Work

22

20

2

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
78
Bidding Soon
975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

Project location map

WV-76, Flemington, WV

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed