Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Marysville, Ohio. Conceptual plans call for the renovation of a detention facility.
The Ohio Reformatory for Women (ORW), located at 1479 Collins Ave, Marysville, OH was originally opened in 1916. ORW is the State of Ohio and Department of Rehabilitation and Correction (ODRC) largest all female facility. It is situated on approximately 260 acres, with 60 of these acres confined within the campus' secure perimeter. ORW houses approximately 2,500 incarcerated women, with most of these female offenders being Level 1 and Level 2 offenders. This Request for Qualifications (RFQ) is being issued to obtain Professional Architectural/Engineering (A/E) services for the design of a Phase 2 HVAC Project which will address items not captured in Phase 1 but identified as end of life in the detailed POR. This POR will be shared with the A&E that is awarded the design contract. The buildings that will be addressed in the Phase 2 HVAC Project include: Hale, JG, ARN, Kennedy, MCC, and Commissary. The upgrades include the installation of new air handlers, heating boilers, DHW boilers, pumps, and cleaning the original ductwork. All new equipment will be integrated into the Building Automation System (BAS), which is Automated Logic. All aspects of the project and related issues will be implemented and operated consistent with ODRC policies and procedures. Scope of Services The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience Construction Cost: $2,726,900.00 Total Project Cost: $3,000,000.00 Professional Services Start: 01 / 25 Construction Notice to Proceed: 02 / 26 Substantial Completion of all Work: 06 / 27 Professional Services Completed: 08 / 27 Submit all questions regarding this RFQ in writing to Nichole Burns at DRC.CAMSRFQ@drc.ohio.gov. at with the project number included in the subject line (no phone calls please). Questions will be answered and posted to online. The method of Contractor Selection has not been Determined at this time.
Conceptual
Jails / Prisons
$3,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2025
1479 Collins Ave, Marysville, OH
Related To This Project
Marysville, OH
--
Marysville, OH
Bid Date: Oct 15 2024
Marysville, OH
Bid Date: Nov 08 2024
Marysville, OH
Bid Date: Nov 08 2024
Marysville, OH
Bid Date: Dec 06 2024
2024 Union County Mill Creek Waterway Improvement Project (Logjam and Select Tree Removal) - 5555077
Marysville, OH
Bid Date: Oct 18 2024
Marysville, OH
Bid Date: Oct 23 2024
Marysville, OH
Bid Date: Oct 21 2024
Marysville, OH
--
Marysville, OH
Bid Date: Sep 13 2024
Marysville, OH
Bid Date: Oct 23 2024
Marysville, OH
--
Marysville, OH
--
Marysville, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.