Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Fountain Valley, California. Completed plans call for site work for a water / sewer project.
License Requirements C-57 Liquidated Damages $1,000 Per Day Project Duration 100 consecutive working days The work necessary for the completion of this contract consists of: 1. Mobilization of equipment and personnel to each well site. 2. Traffic Control - Implement the traffic control plan for Dolphin Well Site as shown on drawing T-6025-S in Appendix A. Obtain an encroachment permit from the City of Fountain Valley. The contractor is responsible for all permit costs. 3. Disconnect the piping & electrical systems from each well and remove the motor, pump column and pump bowls from each well. Each well will receive a new pump and motor, therefore, the existing pump systems for each well site will be scrapped. City staff will handle all electrical disconnections from the existing permanent motor. The permanent motor may be stored on-site inside the pump house on a pallet supplied by Contractor. Disposal of the old motors and pumps is the responsibility of the Contractor. 4. Furnish new pump assembly and new pump motor as a mated pair for each well. Include new column pipe, couplings, line shaft, adaptors and other ancillary equipment and appurtenances for the well, resulting in a fully operable pumping system at the City's design rate and TDH. 5. Conduct an initial video survey of the entire well casing at each well site. 6. Initiate biocleaning of each well casing by injecting Herc Chem Tech (HCT) WaterSOLV(TM) BC via a dual-swab tool throughout the perforated sections of each well casing to help remove encrusting material and/or biofilm from the casing walls. Conduct wire brushing (using a steel wire brushes at the Tamura and Dolphin Shallow wells, and a stiff nylon brush at the Dolphin Deep Well), and then bail sediment fill from the bottom of each casing. 7. Perform "Air-Jetting" at each well to help open up the original gravel pack and perforations or screen, used for each original well. 8. Conduct chemical treatment at each well using HCT solutions, as specified. 9. Perform mechanical redevelopment via simultaneous swabbing and airlifting of the chemical solutions from each well. Fluids generated during this process shall be treated prior to discharge to the local storm drain system at each well. 10. Perform an interim video survey to help ensure the effectiveness of the chemical and mechanical rehabilitation operations. 11. Conduct an Electro-Magnetic Thickness (EMT24) survey of the entire well casing at the Tamura and Dolphin Shallow Wells only. 12. Perform a caliper survey to measure the current diameter of the casing(s) at the Tamura and Dolphin Shallow Wells only. 13. Perform a gyroscopic casing survey at the Tamura and Dolphin Shallow Wells only. 14. Install Type 304L Stainless Steel full casing liners and gravel packs, as specified at the Tamura and Dolphin Shallow Wells only. 15. Conduct an interim video survey of the entire well casing at the Tamura and Dolphin Shallow Wells only to document the state of newly installed liners. 16. Mobilize, install, operate, maintain, and then remove a temporary test pump and test motor capable of pumping up to 3,000 gpm at each well site. 17. Conduct pumping redevelopment by pumping and surging at each well. 18. Conduct a 12-hour step-drawdown test and a 24- to 48-hour constant rate pumping test at each well. 19. Near the end of the constant rate pumping test, perform a dynamic spinner survey in each well. 20. Remove the test pump and perform a final video survey at each well site to help check for possible damage from installation and/or removal of temporary test pump, and to determine the amount of sediment fill in the bottom of each casing; bail the accumulated sediment. 21. Perform additional brushing and bailing at each well to further help remove any biological build up prior to the installation of the permanent pump. 22. Mobilize, install, operate, maintain, and then remove a temporary test pump and motor at each well site. Estimated Bid Value $2,650,000.00 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 10/17/2024 at 10:00 AM PT Online Q&A Yes
Bid Results
Water / Sewer
$2,317,060.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
28
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2024
January 6, 2025
Multiple Locations, Fountain Valley, CA
Related To This Project
Fountain Valley, CA
Bid Date: Nov 07 2024
Fountain Valley, CA
Bid Date: Nov 21 2024
Fountain Valley, CA
Bid Date: Dec 03 2024
Fountain Valley, CA
Bid Date: Nov 21 2024
Fountain Valley, CA
--
Fountain Valley, CA
Bid Date: Nov 14 2024
Fountain Valley, CA
Bid Date: Dec 09 2024
Fountain Valley, CA
Bid Date: Oct 28 2024
Fountain Valley, CA
Bid Date: Oct 30 2024
Fountain Valley, CA
Bid Date: Oct 28 2024
Fountain Valley, CA
Bid Date: Oct 16 2024
Fountain Valley, CA
Bid Date: Oct 08 2024
Fountain Valley, CA
Bid Date: Sep 24 2024
Fountain Valley, CA
Bid Date: Oct 02 2024
Fountain Valley, CA
Bid Date: Aug 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.