Site work for a civil project in Saint Paul, Minnesota. Completed plans call for site work for a water / sewer project.

https://www.bizjournals.com/twincities/news/2024/10/15/msp-airport-starts-work-more-gate-improvements.html MSP airport starts final phase of $242M makeover MSP airport improvementsexpand A rendering of Gate G4 at the Minneapolis-St. Paul International Airport shows improvements to the seating areas, carpets, ceilings and lighting as part of the final phase of Terminal 1's $242 million overhaul. METROPOLITAN AIRPORTS COMMISSION Cam Bonelli By Cam Bonelli – Reporter, Minneapolis / St. Paul Business Journal Oct 15, 2024 Listen to this article 2 min Passengers can expect to see more gate improvements at Minneapolis-St. Paul International Airport as it embarks on the final phase of its $242 million Terminal 1 overhaul. The Metropolitan Airports Commission and Delta Air Lines (NYSE: DAL) began work this week on phase 3 of its largest-ever interior renovation of concourses and passenger gate areas after completing phase 2 months ahead of schedule. For the latest phase, gate improvements include new flight-information screens at every gate, new gate seating with power outlets, lighting, carpeting and refreshed Delta branding across gate areas in Concourses A, B, G and gates G1-6, G14, G15 and adjacent corridor areas. Additionally, new flooring and ceilings will be installed and the sky bridge that connects concourses C and G will be renovated. The first two phases included updates to concourses C, D and F including new carpet or terrazzo flooring, painting and wall enhancements, as well as new podiums, signage and seating in gate areas. CG CONNECTOR ULTRAexpand A rendering shows improvements to the Minneapolis-St. Paul International Airport's sky bridge connection from Concourse C to Concourse G through the final phase of a $242 million overhaul of Terminal 1. METROPOLITAN AIRPORTS COMMISSION Airport operations will mostly be unimpacted during construction, most of which will occur overnight. The update is part of the Airport Modernization Program, a 3-year initiativethat began in 2023 to upgrade six of MSP's seven concourses in Terminal 1 and 75 seating areas around Delta Air Lines gates. The MAC invested 75% of the project's cost ($182.5 million) and Delta is contributing the rest ($60 million). Work in Concourse F is mostly completed, and Concourse D renovations will be completed later this fall. Renovations in Concourse C will continue through the summer of 2025. The MAC expects to complete the Airport Modernization Program by the end of 2025. The MAC has several other improvement projects underway. This week the next phase of expanding Concourse G (between Gates G8-G13) started. In September, the MAC started a $263 million upgrade of Terminal 2. The Terminal 2 expansion includes adding 168,000 square feet with two new gates and passenger seating to the northern side of the facility. The expansion will also provide new concession areas and restrooms through the renovation, prompting a new request for proposals for restaurant and store opportunities for the first time in a decade. _______________________________________ Site Directions: Minneapolis-St. Paul International Airport This project provides for the installation of lift stations, valves, and meter manholes to support the Runway 12R-30L glycol forcemain. This forcemain collects glycol impacted fluid from the Runway 30R and 30L deicing pads at Post Road and pumps it to the gravity sewers on the north side of Taxiway M to ultimately deliver it to the Glycol Management Facility. The goal of the MAC for the utilization of Targeted Group Businesses on this project is 13%.

Bid Results

Water / Sewer

$1,992,037.00

Public - State/Provincial

Site Work

37

15

25

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
35
Bidding Soon
781
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

April 14, 2025

img_map_placeholder

4300 Glumack Dr, Saint Paul, MN


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.