BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Saint Paul, Minnesota. Working plans call for the renovation of a educational facility.

** As of 10/23/2024 The owner has selected a Construction Manager. A timeline for construction has not yet been established.” Responder questions due in Getall September 27, 2024 @ 2:00pm Responders shall submit in writing all project and RFP questions, including any questions from site visit, via GetAll for incorporation into any addenda. No telephone, email or in-person inquiries will be accepted. Saint Paul Public Schools, Independent School District #625, is requesting proposals for CMa services for Hamline Elementary Secure Entry, Heating & Plumbing Replacement. The intent of the project is to replace mechanical equipment and plumbing in the center section of the building past its useful life, reconfigure the front entryway with secure access design features, sprinkle portions of the building currently not, as well as install new classroom projector technology in the teaching spaces. The primary point of contact for proposals is: Saint Paul Public Schools Purchasing & Contract Services Javier Gonzalez, Contract Manager Email: javier.gonzalez@spps.org A Proposal once delivered to the formal custody of SPPS may not be withdrawn until sixty (60) days after a Proposal is received and acknowledged. Once documents have been received by SPPS, all documents become the property of SPPS. When documents are opened, they become public information and any restrictions put upon SPPS regarding the sharing of information or duplicating copies after opening will be grounds to reject a proposal. SPPS reserves the right to negotiate on any or all components of each Proposal submitted. From the time the Proposals are submitted until the formal award of a contract, each Proposal is considered a working document and, as such, will be kept confidential. The negotiation discussions will be confidential until such time as the award is completed. The preliminary construction cost estimate is $8,269,195. This value includes all hard construction costs, including prime contractor general conditions, inflation multiplier, and estimating/design contingency. It does not include construction contingency, or SPPS provided furniture (not in design scope) or SPPS provided instructional audio-visual equipment.

Pre-Construction/Negotiated

Educational

$609,440.00

Public - City

Renovation

3

5

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
33
Bidding Soon
792
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

June 9, 2025

img_map_placeholder

1599 Englewood Ave, Saint Paul, MN


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.