BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Saint Paul, Minnesota. Completed plans call for the renovation of a municipal facility.

As of October 14,2020 the project has been awarded but contractor's information is not yet available. Provide all labor, equipment, service truck with materials and tools, transportation, permits, fees, licenses, etc. for completing installation of Ionization devices and connection to electrical power in HVAC equipment for all City of Saint Paul facilities, streets, and parks on an as-needed basis. Work is to be completed by licensed electricians under electrical permits. Q and a open: Thursday, September 17, 2020 6:30:00 AM CDT Q and a close: Thursday, October 01, 2020 12:30:00 AM CDT The project will be covered by the City of Saint Paul, Project Labor agreements Policy. The City reserves the right to accept/reject any or all bids or portions thereof, and further, reserves the right to accept/reject any or all subcontractors. Goals- 32% Minority total project hours 20% Female total project hours o 5% to minority-owned business enterprises (MBE) o 10% to woman-owned business enterprises (WBE) o 10% to other small business enterprises (SBE) The general scope of work for this project shall be to complete the electrical power connections required to install GPS, Needle Point Bipolar Ionization equipment (GPS/NPBI) in all City facilities as directed by the Project Manager based on submitted Time and Material rates. The GPS/NPBI equipment shall be provided to the sites by the owner. Contract may be required to assemble and install the GPS/NPBI equipment into the mechanical equipment per the manufactures provided installation instructions. For each location the contractors shall be provided a materials list and a list of HVAC equipment for installation of the GPS/NPBI equipment. The required installation labor time and list of miscellaneous materials required to complete the work scope at each location will be documented and submitted for approval of the Project Manager. Contractors are to verify all installation work is complete and functional prior to moving on to the next location. All compliance reporting shall be completed in a timely manner. Questions related to possible discrepancies or inaccuracies shall be submitted for clarification to the Project Manager prior the closing date for questions for the project bid period.

Bid Results

Municipal

$1,166.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
33
Bidding Soon
796
All Active Projects
360
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2020

November 9, 2020

img_map_placeholder

Multiple Locations, Saint Paul, MN


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.