BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Memphis, Tennessee. Completed plans call for the renovation of a municipal facility.

RFP (Request for Proposal) to recommend selection of a Construction MRFP (Request for Proposal) to recommend selection of a Construction Manager/General Contractor to the State Building Commission. The project includes complete interior renovation of an existing 125,954 gross sq. ft. building. See the Programming Study Update 2024 by Williams Blackstock Architects (attached in the posted solicitation documents) titled Robert F. & Avron B. Fogelman Business Complex for detailed information. This project includes only the Phase 1 base interior renovation, plus the following alternates - renovate existing restrooms, and replacement of existing elevators. Phase 2 for the New Building Additional will occur at a later date if future funding is available. The Owner will have the option to award any future Phase 2 CM/GC contract to the selected CM/GC for this solicitation (based on performance of Phase 1 work). The scope of the project will include but will not be limited to the following as budget will allow: Architectural - Base renovation includes replacement of floor finishes, painting walls, ceiling replacements, minor space reconfiguration with demo and new drywall partitions, renovation of existing restrooms (Accepted Alternate), replacement of elevators (Accepted Alternate), replace doors and new electronic locks, add interior window / view lights, wood paneling and trim, and new acoustical ceilings throughout. Mechanical - Replace existing air handlers with fan wall units, utilize existing ductwork with modifications as required, replace piping, install VFD's, new terminal VAV units and diffusers, replace all pumps, new plumbing fixtures, domestic water heater, replace waste lines and supply if needed, add a fire pump. Other mechanical mods/replacements as required including new fire protection, replace boiler in adjacent chiller plant, and replace all controls. Electrical - New LED lighting, replace transformer, new motor control center, switchgear if needed. Included will be revisions/additions for ADA and current code compliance, fire safety systems, information technology, audio visual systems, interior signage, and security features.anager/General Contractor to the State Building Commission. The project includes complete interior renovation of an existing 125,954 gross sq. ft. building. See the Programming Study Update 2024 by Williams Blackstock Architects (attached in the posted solicitation documents) titled Robert F. & Avron B. Fogelman Business Complex for detailed information. This project includes only the Phase 1 base interior renovation, plus the following alternates - renovate existing restrooms, and replacement of existing elevators. Phase 2 for the New Building Additional will occur at a later date if future funding is available. The Owner will have the option to award any future Phase 2 CM/GC contract to the selected CM/GC for this solicitation (based on performance of Phase 1 work). The scope of the project will include but will not be limited to the following as budget will allow: Architectural - Base renovation includes replacement of floor finishes, painting walls, ceiling replacements, minor space reconfiguration with demo and new drywall partitions, renovation of existing restrooms (Accepted Alternate), replacement of elevators (Accepted Alternate), replace doors and new electronic locks, add interior window / view lights, wood paneling and trim, and new acoustical ceilings throughout. Mechanical - Replace existing air handlers with fan wall units, utilize existing ductwork with modifications as required, replace piping, install VFD's, new terminal VAV units and diffusers, replace all pumps, new plumbing fixtures, domestic water heater, replace waste lines and supply if needed, add a fire pump. Other mechanical mods/replacements as required including new fire protection, replace boiler in adjacent chiller plant, and replace all controls. Electrical - New LED lighting, replace transformer, new motor control center, switchgear if needed. Included will be revisions/additions for ADA and current code compliance, fire safety systems, information technology, audio visual systems, interior signage, and security features. Comments Deadline October 18, 2024

Post-Bid

Municipal

$300,000.00

Public - State/Provincial

Renovation

101

4

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
28
Bidding Soon
399
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 16, 2024

img_map_placeholder

To Be Determined, Memphis, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.