BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Michigan City, Indiana. Completed plans call for site work for a water / sewer project.

the Project is Located in Michigan City, Indiana and Generally Consists of a New Gravity Sanitary Sewer. The Project is Located Near the Millennium Industrial Park and Swan Lake Cemetery With Portions Extending Southward Along Us 20 to the Abandoned Autumn Creek Trailer Park. The Project Will Provide Sanitary Sewer Service to the Recently Annexed Area North and South of Us 20. Effluent From the New Sewer Will Be Conveyed to Michigan City's J.b. Gifford Water Treatment Plant for Treatment. The Work for the Project Includ Furnishing All Labor, Materials, Equipment, Supplies, and Services for the Construction of the Project as Defined in the Contract Documents. each Bid Must Be Accompanied by a Certified or Cashier's Check on a Solvent Bank or Trust Company, Drawn to the Order of the Michigan City Sanitary District, or an Acceptable Bid Bond, in an Amount of Not Less Than 10 Percent (10%) of the Total of the Base Bid Plus the Bids for All Alternates Associate With the Project. This Sum is a Guarantee That, if the Bid is Accepted, a Contract Will Be Entered Into and Its Performance Properly Secured. The Bid Security of All Bidders, Excepting the Three Lowest, Responsive, Responsible Bidders Will Be Returned Within Thirty (30) Days After the Opening of Bids. Any Bidder Whose Bid Security Has Been Retained May, After Thirty (30) Days From the Opening of Bids, Request Return of His Bid Security Provided He Has Not Been Notified of Acceptance of His Bid. The Bid Security of the Successful Bidder Will Not Be Returned Until Bidder Delivers the Required Signed Contract and Performance Bond. Any Bid May Be Withdrawn Prior to the Scheduled Time for the Opening of Bids or Authorized Postponement Thereof. No Bid May Be Withdrawn for Sixty (60) Days After the Scheduled Time for Opening, Unless Agreed to by the Owner. The Board Reserves the Right to Reject Any or All of the Bids Received. All Bid Awards Are Made Subject to an Appropriate Contract Being Finalized Between the Owner and the Winning Bidder.

Bid Results

Water / Sewer

$1,449,956.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
74
Bidding Soon
1,795
All Active Projects
751
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

November 25, 2024

img_map_placeholder

Multiple Locations, Michigan City, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.