BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fraser, Colorado. Completed plans call for site work for a water / sewer project.

The work of this section consists of temporary measures for the control of erosion, sedimentation, and other pollutants during construction. Work includes installation of such measures in accordance with the Drawings and any permits for the project, maintenance during the contract period to assure proper function, and removal of temporary measures in coordination with installation of permanent erosion control measures. The Contractor shall provide and maintain adequate erosion control measures during all phases of construction to protect surface waters from run-off transporting eroded materials. The erosion control measures shall be inspected during and after each run-off event, with repairs being made and excess sediment removed as needed. The Contractor is responsible for preventing sediment from traveling off-site or to nearby water sources. Reference Number 0000364554 The site of the work is within the Town of Fraser. The work generally consists of the following major items: . General: Includes mobilization/demobilization, bond, 3rd party materials testing subcontractor, sediment control, traffic control, and construction dewatering. . Installation of Water Main: Includes approximately 670' of new 8" C-900 PVC water main, 230' of new 6" C-900 PVC raw water main, and add alternate of 340' of new 8" C-900 PVC water main with 4 service reconnections. . Water Main Appurtenances: Includes 3 fire hydrants, fittings, valves, and connections to existing distribution system. . Restoration: Includes road base disturbed areas restoration and replacement of disturbed concrete and asphalt surfaces. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- Bid security in the amount of 5 percent, unqualified, of the total Proposal price, will be required with each Proposal. Character and disposition of such bid security are stated in "Instructions to Bidders" of the Contract Documents. Included with the Contract Documents is a Bid Bond Form to be used by Bidders not submitting a cashier's check or a certified check. Question Deadline 10/11/2024 at 5:00 PM MT Questions are submitted online Yes

Award

Water / Sewer

$442,858.00

Public - City

Site Work

11

13

4

7

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
43
Bidding Soon
922
All Active Projects
417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.