BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Site work for a water / sewer project in Fraser, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000379114 Job Location: Town of Fraser, CO The work generally consists of the following major items: General: Includes mobilization/demobilization, bond, 3rd party materials testing subcontractor, sediment control, traffic control, and construction dewatering. the work generally consists of the following majoritems: o general: includes mobilization/demobilization, bond, 3 rd party materials testing subcontractor, sediment control, traffic control, and construction dewatering. o installation of water main: includes specifically sequenced new water mains and valve replacements. new water mains include approximately 175 lf of 6" c900 pvc and 192 lf in a separate location of new 8" c-900 pvc water main, replacement of existing 8" tee and valves with new 8" cross and valves, and cut-in replacement of an existing 8" gate valve. o water main appurtenances: includes four (4) 8" mj gate valves, three (3) 6" ductile iron waterline fittings, nine (9) 8" ductile iron waterline fittings, plus associated fittings, hot taps, and valves at connections to existing distribution system. o restoration: includes asphalt, concrete, and reseeding restoration of disturbed areas. Installation of Water Main: Includes specifically sequenced new water mains and valve replacements. New water mains include approximately 175 LF OF 6" C900 PVC and 192 LF in a separate location of new 8" C-900 PVC water main, replacement of existing 8" tee and valves with new 8" cross and valves, and cut-in replacement of an existing 8" gate valve. Water Main Appurtenances: Includes four (4) 8" MJ gate valves, three (3) 6" ductile iron waterline fittings, nine (9) 8" ductile iron waterline fittings, plus associated fittings, hot taps, and valves at connections to existing distribution system. Restoration: Includes asphalt, concrete, and reseeding restoration of disturbed areas. Question Deadline 03/19/2025 at 2:00 PM MT Questions are submitted online Yes, Questions must be posed through online. General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Safety Standards Plan - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

9

11

4

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
98
Bidding Soon
1,344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.