Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

West Plant Air Header Improvements All questions/inquiries must be sent to Nathan Churchill, Procurement Specialist, at nchurchill@mmsd.com. 20% of the total contract price (13% MBE, 2% WBE, 5% SBE/VBE) Live Vendor Engagement and Q&A November 5, 2024 2:00 p.m. Live virtual meeting All attendees must pre-register Contact Nathan Churchill nchurchill@mmsd.com The Plans for the construction of the West Plant Air Header Improvements at Jones Island Water Reclamation Facility, Contract J02012C01 consist of 46 sheets dated September 2024. The location of the work is shown on Sheet 3 of 46. Work covered by these Contract Documents in general covers the following: o Provide internal joint seals on existing air header o Provide tapping sleeves, pipe taps, and blind flanges for new access points to existing air header o Provide weld repairs of exterior steel air header o Provide masonry removal and restoration o Replace ductile iron pipe and fittings o Provide stainless steel air pipe and fittings o Provide valves o Provide expansion joints o Remove and replace conduit and wiring o All other work as shown in the Contract Documents. Execute planning, field measurement, coordination with other trades, cutting, fitting, and patching of work, required to: Make the several parts fit properly. Uncover work to provide for installation of out of sequence work. Remove and replace work not conforming to requirements of the Contract Documents. Remove and replace defective work. Remove samples of installed work as specified for testing. Install specified work in existing construction. As applicable to the work scope of each specific section, in addition to the specified requirements, upon written instructions of the Engineer: Uncover work to provide for the Engineer's observation of covered work. Carefully remove samples of installed materials for testing. Carefully remove work to provide for alteration of existing work. Do not endanger any work by cutting or altering work or any part of it. Do not cut or alter work of another contractor. Do not cut structural or reinforcing steel.

Bid Results

Water / Sewer

$2,578,569.00

Public - County

Site Work

52

21

6

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
53
Bidding Soon
1,234
All Active Projects
513
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

January 1, 2025

img_map_placeholder

700 E Jones St, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.