EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 15, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a transportation facility in Fort Pierce, Florida. Completed plans call for site work for a transportation facility.

Main Terminal Improvements All Bidders are required to submit a five percent (5%) Bid Bond with the Bid Form or their bid shall be rejected as non-responsive. A one hundred percent (100%) Public Construction Bond is required upon notification of St. Lucie County intention to award the contract to the apparent successful bidder. Bids may be mailed or hand delivered to the St Lucie County Purchasing Department, 2300 Virginia Avenue, 2nd Floor Rm. 228, Fort Pierce, FL 34982. Any bids received after the above stated time shall be returned to the bidder unopened. Bidders shall submit ONE (1) MARKED ORIGINAL AND TWO (2) PHOTOCOPIES OF THE COMPLETED BID PACKAGE in a sealed envelope. The Project Name, Bid Number, and time and date of the Bid opening shall be clearly marked on the outside of the sealed envelope. Facsimile responses shall not be accepted. A 1.55% DBE participation is required for this bid, if the total proposed DBE participation is less than the established DBE goal, Bidder must provide written documentation of the good faith efforts as required by 49 CFR Part 26, or their bid shall be rejected as non-responsive. Treasure Coast International Airport and Business Park is a member of the Unified Certification Program (UCP) in the State of Florida. The Treasure Coast International Airport and Business Park will only accept DBE Firms that are certified under the Unified Certification Program. All Bidders are required to submit a five percent (5%) Bid Bond with the Bid Form or their bid shall be rejected as non-responsive. A one hundred percent (100%) Public Construction Bond is required upon notification of St. Lucie Countys intention to award the contract to the apparent successful bidder. Bidders may not withdraw their Bid for a period of ninety (90) calendar days after the bid opening date. The Board of County Commissioners reserves the right to waive any informalities or minor irregularities; reject any and all bids/proposals which are incomplete, conditional, obscure, or which contain additions not allowed for; accept or reject any proposal in whole or in part with or without cause; and accept the proposal which best serves the County. Deadline for Questions (in writing, only) 10/29/24 Monday 3:00PM

Award

Transportation Terminals

$200,000.00

Public - County

Site Work

58

22

13

8

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Dimensional Letter Signage, Interior Specialties, Wall and Door Protection, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Storage Specialties, Lockers, Metal Lockers, Exterior Specialties, Protective Covers, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Portable Lamps, Lamps, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Electrical and Cathodic Protection, Facility Lightning Protection, Lightning Protection for Structures, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
61
Bidding Soon
921
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

December 6, 2024

img_map_placeholder

3000 Curtis King Blvd, Fort Pierce, FL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Main Terminal Renovations At Treasure Coast International Airport and Business Park

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.