Site work and paving for a civil project in Riverside, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Provide all labor, materials and equipment necessary to provide precise grading and landscaping for the Northside Agricultural Innovation Center at 895/900 Clark St. in accordance with the attached drawings and specifications. The selected bidder shall also obtain the required permits from other City Departments and/or other agencies as may be required by law as part of the project scope. The City will pay City permit fees. All work must be completed within One Hundred and Twenty Two (122) calendar days after the Date of Commencement established in the City's initial Notice to Proceed. Once all permits are issued, the bidder will be responsible for providing all materials and labor to fully complete the project in accordance with the approved and permitted plans and specifications. Bidder will be responsible for all phases of construction including but not limited to, demolition, disposal, surveying, grading, trenching, site work, irrigation plumbing, electrical, and landscaping. The City of Riverside General Services Department has determined bidders shall hold a valid and in good standing Class "A" General Engineering Contractor or Class "B" General Building Contractor with the California Contractors State License Board. Pre-Bid Meeting: No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Type of Award Lump Sum Bid prices shall be firm for 120 days from date of proposal opening to permit staff evaluation and City Council award. Upon award, prices quoted will be in effect for the term of the contract. The Purchasing Manager reserves the right to waive any irregularities or informalities. The City Council reserves the right to reject any or all bids. Question Deadline 10/16/2024 at 2:00 PM PT Online Q&A :Yes The discharge of any pollutants into the City storm drain system or natural drainage areas is prohibited per Section 14 of the City Municipal Code and the Riverside County Area-Wide Municipal Storm Water permit issued by the State Water Resources Control Board. Drainage from construction sites and construction activities is prohibited from entering the City storm drain system and natural drainage areas. Any violations of the above provisions are subject to fines by the City and by the State Water Resources Control Board. The City Engineer may order the suspension of construction operations if the Contractor fails to comply with the requirements of this section. Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.

Award

Roads / Highways

$1,594,887.00

Public - City

Paving, Site Work

38

14

4

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
102
Bidding Soon
2,229
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

November 28, 2024

img_map_placeholder

895 Clark St, Riverside, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.