Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Moore Haven, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Counties : Glades Road Name: SR 78 Limits: 05020000 Project(s): 43607915201(*) Federal Aid No: N/A Total Roadway Length: 0.098 Miles Total Bridge Length: 0.098 Miles Total Proposal Length: 0. 196 Miles Contract Days: 135 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days (acq. time) Description: The improvements under this Contract consist of spall repair, pile jackets, expansion joints and ditch pavement along SR 78 for Bridge #050057 over Fisheating Creek and Bridge #050058 Herbert Hoover Dike Relief in Glades County. Question Deadline 10/31/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Bridge Repair/Rehabilitation - SR 78
Post-Bid
Bridges / Tunnels
$2,820,422.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2024
November 18, 2024
FL-78, Moore Haven, FL
Related To This Project
Moore Haven, FL
Bid Date: Dec 05 2024
Moore Haven, FL
--
Moore Haven, FL
--
Moore Haven, FL
--
Moore Haven, FL
--
Moore Haven, FL
Bid Date: Sep 30 2024
Moore Haven, FL
Bid Date: Sep 17 2024
Moore Haven, FL
Bid Date: Aug 16 2024
Moore Haven, FL
Bid Date: Jul 11 2024
Moore Haven, FL
Bid Date: Jun 27 2024
Moore Haven, FL
Bid Date: May 15 2024
Moore Haven, FL
Bid Date: Mar 27 2024
Moore Haven, FL
Bid Date: Mar 04 2024
Moore Haven, FL
Bid Date: Dec 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.