BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Sandstone, Minnesota. Completed plans call for site work for a water / sewer project.

The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum bids for replacement of an on-site septic system for the home located at 32586 State Hwy 123, Sandstone. General Notes: It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the MN Chapter 7080. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. Contractor must reconnect all utilities, service panel or service feed. Contractor will secure all permits and fees. Contractor is responsible for a thorough investigation of the scope of work. Contractor will repair any damage to the property or structure created by the scope of work. Contractor shall be responsible for all debris removal related to all work performed under this work scope. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES. Work Scope Description: Please note that bids will only be accepted from licensed septic installers performing 34% or more of the work scope themselves. Bids will not be accepted from general contractors or contractors with restricted licenses. Contractor shall provide all equipment, materials and labor to complete the work described or referenced in this rfp, provided 2016 MLB Spec Book, MN Chapter 7080 and within the provided Environmental Systems design. Install an on-site septic system per the approved septic design provided by Environmental Systems dated 7/10/24. Contractor shall ensure a complete and functional system. The contractor shall have the existing septic tank pumped and crushed or filled. Contractor shall assume existing tanks holds up to 3,500 gallons. Contractor shall complete tank abandonment form and submit a copy to the Project Coordinator. Contractor shall be responsible for obtaining a Pine County septic permit and coordinating required inspections. Contractor shall be responsible for contacting the Pine County inspector to schedule inspection of scratch, tanks, rock bed and final cover. Additionally, contractor must give the I.H.S. Engineer and Carla Dunkley, Project Manager, a minimum of 48 hour notice before starting the installation to schedule project site visits to see scratch, tanks and rock bed before covering. Contractor shall provide an As-Built System drawing for submission to MLBO. Contractor will not receive final payment until Pine County has completed a successful final inspection and issued a Certificate of Compliance; and Owner has been supplied with full lien waivers for all subcontractors and suppliers. Contractor is responsible for removal and disposal of existing mound materials per design and disposing of them off-site. Contractor shall re responsible for replacing all existing sand. Please disregard the note in the design allowing existing sand to remain if it passes a jar test. Contractor shall include the cost of removing and disposal of all existing materials; and supply and install of all new materials, including be not limited to cover materials, topsoil, sand, rock, fabric and piping. Contractor shall be responsible for pumping tanks for the duration of project, including the period of drying once the old mound materials are removed. Contractor is responsible for cutting vegetation and tree removal as required to install the system in accordance to MN Chapter 7080. Contractor shall follow proper MN Chapter 7080 mound prep procedure, keeping traffic off the designated mound area. Contractor shall be responsible for the cost of any: compaction testing; re-design fees; or additional costs associated with system redesign or relocation; if these expenses are incurred due to contractor or subcontractor damaging the mound location. Contractor shall provide and install Polylok PL122 filter with alarm per design. Contractor shall provide and install flow control, timed does & alarm: SJE Rhombus model: IFS11W114H-8AC17G1J. Contractor shall be responsible for electrical connections and any required trenching. Contractor will be responsible for all yard repairs caused by system installation, including grading, black dirt cover and seeding. Contractor is responsible for calling Gopher One before digging. Although we acknowledge the weather and soil condition dependent nature of the work, it is expected that the work be completed as soon as possible; but the contract will be drafted with a completion deadline date of July 31, 2025. Contractor shall include 0.5% TERO tax fee in base bid, if amount exceeds $25,000.00. Submission of receipt for paid TERO fee is required with application for final payment. Specified Product Substitutions: No substitutions will not be allowed on products specified within the design. Interested bidders shall contact Carla Dunkley, Compliance & Residential Projects Manager at 320-630-2495 or by email at carla.dunkley@millelacsband.com for a copy of the 2016 MLB Spec Book, Environmental Systems design or to be included on the bidder's list in the event that any addendums are issued for this project. COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON. Bidding Notes: All contractors encourage to include the following with their proposals: a. Sign and completed Mille Lacs Band Bid Form. (REQUIRED) b. Completed and signed bid schedule included in IHS specifications. (REQUIRED) c. Copy of current MLB Vendor's License. (or a copy of submitted application) d. Copy of current certificate of insurance for General Liability and Property Damage. e. Copy of an authorized signature sheet if one is not already on file with the Mille Lacs Band. All Contractors (including subcontractors) must comply with Davis Bacon wage requirements. All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment requirements (see 18 MLBSA 5). Contact Lori Trail at (320) 532-4778. The Band reserves the right to reject any bid that it is unable to collect at the Onamia post office by the bid deadline date and time, provided that the Band has made diligent and reasonable efforts to collect the bid. The Band reserves this right even in the event that the bid has been postmarked before the deadline. PROPOSALS NOT SUBMITTED IN THIS MANNER WILL BE REJECTED. Licensing: Firms must be licensed with the Mille Lacs Band of Ojibwe. A copy of this license (or the license application) must accompany each bid. If you are not currently licensed with the MLBO, please submit a copy of your license application along with your proposal. Contact Elizabeth Thornbloom at (320) 532-8274 or via email at EThornbloom@grcasinos.com with questions regarding licensing and for the license application. Contractors must be MN licensed septic installers.

Post-Bid

Water / Sewer

$156,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
11
Bidding Soon
285
All Active Projects
129
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

img_map_placeholder

32586 MN-123, Sandstone, MN

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.