Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 10, 2025 at 7:00 PM

Updated October 11, 2026

Site work for a water / sewer project in Orange Park, Florida. Completed plans call for site work for a water / sewer project.

all required documents. Wyndegate Drive Pump Station Improvements The Project is located at 1150 Wyndegate Drive, west of the Egremont Drive intersection. It is located between the properties at 1142 & 1164 Wyndegate Drive. The Project limits are the pump station site property, street right of way, and utility easements within the Town of Orange Park. The major work elements include, but are not limited to, the following: Base Bid: a. Remove existing suction lift pumps, piping, electrical, concrete wetwell and brick and block concrete building b. Remove portions of existing gravity sewer system C. Remove 3 pine trees between 18" and 24" circumference d. Install new modified gravity sewer system and junction manhole to be SpectraShield lined e. Install Town provided 8' Diameter Wetwell sections and wetwell Top Slab. Bottom slab and first riser to be field poured or precast by contractor. Entire wetwell to be SpectraShield lined. (Contact Town PW office directly for inspection) f. Construct new submersible pumps valves and piping g. Install new electrical service and pump control panels h. Install new driveway, site specific fencing (C-13/14) with privacy screening and rock (57 stone type) over landscape fabric inside fence area i. Install new remote telemetry control system (Town specific) and reuse antenna tower Alternate Additive Bid #1 Install landscaping as shown on sheet C-15 under separate alternative bid item The Owner shall reserve the right to accept or reject any or all bids/proposals, waive minor formalities, and any that are in any way incomplete or irregular. The Owner further reserves the right to reject all bids/proposals and re-advertise, or to reject all bids/proposals without further action and award the bid/proposal that serves the Owner's best interest, not necessarily the lowest bid. Any questions regarding the bid documents shall be in writing and directed to the Engineer of Record, Paul Ina, at email pina@cmtengr.com. The bidders will be required to submit a Bid Bond equal to 5% of the bid with their Proposal. Each bid proposal shall remain binding for at least 90 days after the scheduled bid date. Once awarded, the bidder will be required to furnish Performance and Payment Bonds covering the total cost of the project including a Surety accepted by the Owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated budget is between $475-525k.

Award

Water / Sewer

$525,000.00

Public - City

Site Work

17

14

14

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
79
Bidding Soon
1,325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

Project location map

Wyndegate Dr, Orange Park, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed