BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Firestone, Colorado. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000365473 Replacement of off-system bridge structural number FRSTN20.0-15.0A, which carries Weld County Road 20 over the Coal Ridge Ditch. The bridge substructure and superstructure are significantly deteriorated resulting in the replacement of the bridge with Concrete Box Culvert. The major components of the project include the following items: Removal of the existing bridge structure Installation of new Concrete Box Culvert The design plans and specifications that relate to the replacement of the bridge are provided in Exhibit A. The contractor shall complete all work within 120 days per the "Notice to Proceed". Completion Date: March 31, 2025 Description: Implementation of the concrete box culvert (CBC) and all other components required to facilitate the functionality of the irrigation system. Question Deadline 10/25/2024 at 5:00 PM MT Questions are submitted online No, All questions related to this bid should be emailed to Kiran Bhusal at kbhusal@firestoneco.gov This is a federally-assisted construction project, and the DBE participation goal is 9.5%. December 1, 2024 (tentative) Notice to Award

Post-Bid

Bridges / Tunnels

$400,000.00

Public - City

Demolition, New Construction, Paving, Site Work

34

5

6

5

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
44
Bidding Soon
931
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 2, 2024

img_map_placeholder

WCR 20, Firestone, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.