BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Centennial, Colorado. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000365734 Job Location: Potomac Street north of HWY 2 The City of Commerce City obtained partial bridge funding for the replacement of the Potomac Street Bridge from CDOT. The Potomac Street Bridge is located approximately 700 feet north of Highway 2 on Potomac Street, latitude 39'54'14" longitude 104'49'40" and exists as the only established means of access for the residential properties north of the bridge to the City's roadway network. The Potomac Street Bridge is located over FRICO's O'Brian Canal. It is critical that theexisting bridge structure be replaced to ensure the safety of users. Potomac Street is designated as a local street from Commerce City HWY-2 to where it terminates, just north of the Potomac Street Bridge. The BSNF railroad has active tracks just south of the bridge. Replacement of the bridge may be occurring with active water flow through the canal. Question Deadline 10/28/2024 at 3:00 PM MT Questions are submitted online No, Questions or comments regarding this RFB must be received in writing no later than time by Mark Winnen at mwinnen@c3gov.com. All Work must be completed within 120 workdays of the issuance of a Notice to Proceed. Buyer Preferences, Guidelines & Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Bidder Prequalification/Preregistration Required - Certification/Training - Certified Payroll - Contractors License Required - Federally Funded - Insurance Required - License Required - Material Safety Data Sheets Required - Prevailing Wage Required - Safety Standards Plan - Spill Containment Plan - Training Required Bonding Requirements - Bid Bond 5 % - Labor and Materials Bond 5 % - Payment Bond 5 %

Post-Bid

Bridges / Tunnels

$400,000.00

Public - City

Demolition, New Construction, Paving, Site Work

65

7

4

6

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
46
Bidding Soon
977
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

December 6, 2024

img_map_placeholder

Potomac St, Centennial, CO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.