BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Demolition, site work, renovation and addition to a municipal facility in Farmington, Michigan. Working plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

As of April 15, 2025, this project is finalizing pre-construction. Construction is expected to start May 5, 2025 and complete August 12, 2025. This Bid Package will consist of separate sealed Bids for the following Bid Divisions: BD 102: Asphalt Paving & Site Concrete BD 103: Selective Demolition BD 104: Concrete Footings, Foundations, & Building Flatwork BD 106: Masonry BD 107: Structural & Miscellaneous Steel BD 109: Roofing & Sheet Metal BD 114: Aluminum Windows, Entrances, Glass & Glazing BD 120: Painting BD 142: Plumbing & HVAC BD 143: Electrical BD 149: Fencing & Gates All Bids must include the following sworn and notarized statements: Familial Disclosure Affidavit (Section 004205), the Iran Linked Business Affidavit (Section 004210), and the Criminal Background Check Affidavit (Section 004220). All Bids must be accompanied by a Bid Security, in either the form of a bid bond or certified bank check, in the amount of five (5) percent of the amount of the Bid, payable to Farmington Public Schools, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or failure of the Bidder to enter a Contract for performance, Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing. If awarded a Contract, the successful Bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the Contract price. Farmington Public Schools reserves the right to accept or reject any and all Bids, either in whole or in part, and to waive any informalities and irregularities therein. Construction is expected to start May 2025.

Pre-Construction/Negotiated

Municipal

$1,213,573.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
223
Bidding Soon
2,611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

May 5, 2025

Project location map

24001 Raphael, Farmington, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.