BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Renovation of an educational facility in Littleton, Colorado. Completed plans call for the renovation of a educational facility.

The scope of services will include assistance to the State during the process of design, construction, and warranty period. Specific tasks to be performed by the Design/Build Entity (D/B) include those generally performed by the D/B construction community where the Designer is also the Contractor. Date Email Questions (Clarifications) Due Jan 15, 2025 by 2:00 PM Email Questions Daniel.Hohn@arapahoe.edu with copy to Cristina.Duke@arapahoe.edu All State responses will be issued via ColoradoVSS on or before January 17, 2025, by 4:00 PM. Anticipated Design Start Mar. 3, 2025 Anticipated Construction Start/Finish May - August 2025, Phase 1 ACC has funding for the first phase with total project budget of $1,653,337 and anticipates that this will be adequate for hardware replacement and access control in Annex and a portion of Main buildings. Construction documents for this and later phases needed to complete the entire campus scope are to be produced in this phase. ACC has requested funding for the second phase and will learn if successful in May 2025. There is no guarantee of funding for following phases (but we are hopeful). If successful with securing additional funding, ACC will seek approval to have the same Design/Build Entity remain in place for following phases.

Award

Educational

$1,653,337.00

Public - City

Renovation

3

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
62
Bidding Soon
1,326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

May 1, 2025

Project location map

5900 S Santa Fe Dr, Littleton, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.