Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2024 at 8:00 PM
Updated October 23, 2024
Site work for a water / sewer project in Clay Center, Kansas. Working plans call for site work for a water / sewer project.
Address: 210 12th Street, Clay Center, KS 67432 The City of Clay Center is requesting bids from licensed and insured plumbing/electrical/sewer contractors for the following scope of work: Labor and materials to install: Two (2) Myers VS30-21/3hp 230V-1ph pumps with 4 Dia X 16 Deep Fiberglass Wet Well with the following to be installed by manufacturer, Pump Guiderail System/ 2 sch80 PVC Discharge Piping/Float Support Bracket/Aluminum Cover/Access Hatch. Install two shut off ball valves, one per pump, located outside adjacent to wet well. One (1) Control Panel 230V/1hp NEMA 4X Stainless Enclosure. One (1) Four Float System Kit. Install a 100 amp 120/240 single phase service built on standoffs on the first pole South of the 12th Street entrance. Include an underground service to feed the provided lift station control box. Wire pumps and float assembly per manufacturer specifications. Include a $1,500.00 budget in proposal for a 10 KVA pole hung transformer. Install 875 Ft of 6-inch Schedule 40 sewer line to lift station Pipe shall have a 4 to 6 inches of compacted fill sand. Cover pipe with a minimum of 12-inches of fill sand above top of pipe. Install 55-feet of 2-inch force main from Lift station to city sewer manhole. One (1) Single Y at Cleanout and pipe extended up to two- feet above grad and install 1 threaded cleanout cap at the end of the 6-inch main. Two (2) Double Y Clean out and pipes to extend up to two-feet above grade and install 2 threaded cleanout caps installed every 275 feet. The City of Clay Center expects the 12th Street Sewer Project to be completed by May 31, 2025. Contractor shall be responsible for calling ONE CALL If you would like to look at the project prior to bidding, you may contact Daton Hess at 785-632-7363. The successful bidder shall provide proof of liability insurance, bid bond and performances bond, workers compensation and proof of Plumbing License in Clay Center, KS. The city shall also be listed as additionally insured. The city reserves the right to accept or reject any and all bids.
Final Planning
Water / Sewer
$1,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 31, 2024
April 22, 2025
210 12th St, Clay Center, KS
Related To This Project
Clay Center, KS
Bid Date: Jun 02 2025
Clay Center, KS
Bid Date: Jan 21 2025
Clay Center, KS
Bid Date: Jan 14 2025
Clay Center Municipal Airport (CYW) Construct 6-Place Nested T-Hangar and Taxilanes (2024) - 5686993
Clay Center, KS
Bid Date: Mar 05 2025
Clay Center, KS
Bid Date: Nov 11 2025
Clay Center, KS
Bid Date: Dec 17 2025
Clay Center, KS
--
Clay Center, KS
Bid Date: Jan 13 2026
Clay Center, KS
Bid Date: Apr 13 2021
Clay Center, KS
Bid Date: Nov 05 2024
Clay Center, KS
--
Clay Center, KS
Bid Date: Jun 11 2024
Clay Center, KS
--
Clay Center, KS
Bid Date: Oct 20 2023
Clay Center, KS
Bid Date: Oct 18 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
