EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 13, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Sayreville, New Jersey. Completed plans call for site work for a water / sewer project.

Each Bid Must Be Accompanied by a Certified Check or Cash in the Amount of Not Less Than Ten (10%) Percent of the Bid, but Not More Than $20,000.00, Payable Without Any Conditional Endorsement as a Guarantee That in Case the Contract is Awarded to the Bidder, He Will Within Twenty-one (21) Days Thereafter Execute Such Contract and Furnish Satisfactorily Performance Bonds. Upon Failure to Do So He Shall Forfeit the Deposit as Liquidated Damages and the Acceptance of the Bid Will Be Contingent Upon the Fulfillment of This Requirement by the Bidder. No Interest Shall Be Allowed Upon Any Such Certified Check or Cash. A Bid Bond in the Amount of Ten (10%) Percent of the Bid, but Not More Than $20,000.00, May Be Substituted for Certified Check or Cash. Each Bid Must Be Accompanied by a Certificate of Experience and Certificate of Equipment. Each Bid Must Also Be Accompanied by a Certificate of Consent of Surety From a Bonding Company Licensed to Do Business in the State of New Jersey and Named in the Current List of "surety Companies Acceptable on Federal Bonds", U.s. Treasury Department, Guaranteeing That if the Proposal of the Bidder Be Accepted They Will Furnish the Bond Set Forth in Paragraph One of the Instructions to Bidders of the Contract and the Acceptance of the Bid Will Be Contingent Upon the Fulfillment of This Requirement. the Successful Bidder Shall Be Required to Comply to the Provisions of the New Jersey Prevailing Wage Act, Chapter 150 of the Laws of 1963, Effective January 1, 1964. Question Deadline 11/04/2024 During the Performance of This Contract, the Contractor Agrees to Comply With the Requirements of P.l. 1975, C. 127 (N.j.a.c. 17:27), and N.j.s.a. 10:5-31 Et Seq., All Requirements of the State of New Jersey Worker Health and Safety Act (N.j.a.c. 12:110 Et Seq.) as Amended and the United States Occupational Safety and Health Act (Osha) (29 Cfr 1910), as Amended With Regard to Worker and Jobsite Safety No Bidder May Withdraw His Bid for a Period of Sixty (60) Days After the Date Set for the Opening Thereof. The Successful Bidder Will Be Required to Furnish a Surety Company Bond in the Full Amount of Contract Price Indemnifying the Borough of Sayreville, New Jersey, for All Proceedings, Suits or Actions of Any Kind of Description and Conditional for the Faithful Performance of the Work. All Bid Security Will Be Returned to All Bidders Except the Three Apparent Lowest Bidders Within Ten (10) Working Days After the Opening of Bids, and to the Three (3) Apparent Lowest Bidders Within Three (3) Working Days After the Successful Bidder Has Executed the Contract and His Contract Security Has Been Approved by the Borough. The Borough Reserves the Right to Reject Any or All Bids if in Its Opinion It is in the Best Interest to Do So and to Award the Contract for Any and/or All Items. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Water / Sewer

$722,350.00

Public - City

Site Work

6

19

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Bowls
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
554
Active Projects
300
Bidding Soon
5,214
All Active Projects
2,430
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

img_map_placeholder

To Be Determined, Sayreville, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Well Maintenance and Redevelopment Services

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.