EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a 9,000-square-foot, three-story above grade medical facility.

Renovation VAMC San Francisco VISN 21 MACC Group 2 SOLICITATION-DESCRIPTION The San Francisco VA Medical Center requires the services of a qualified General Contractor to construct Project 662-23-101, Renovate ICU to Airborne Infection Isolation Standards. The general scope of this requirement is to construct via extensive renovation a modern Intensive Care Unit comprising 10 patient rooms with surge capacity to 12. Four rooms that are dedicated Airborne Infection Isolation and two that are configurable, allowing for a maximum of eight such patients within the Unit. The nature and requirements of this construction are fully exhibited in the attached Construction Documents which include complete drawings and specifications. The area of construction is located within the main hospital in Building 203 with area of work entirely on the 3rd floor B-Wing; effectively the east side of the building on the top floor. Infrastructure work extends beyond the normal areas of work to accommodate work to utility systems. Special care is to be taken as related to impact surrounding clinical areas, most significantly 2nd floor, and utility outages with impact to patients in occupied areas. Noise, vibration, and dust control should be expected to be heavily managed with limitations strictly coordinated. For purposes if pricing, total labor effort should be assumed to comprise roughly 30% of labor outside of normal business hours. (End of Solicitation) A. Project 662-23-101. NAICS Code 236220, Commercial and Institutional Building Construction $45M. In accordance with (IAW) VAAR 836.204(h) Disclosure of the magnitude of construction projects between $10,000,000 to $20,000,000. B. This is a firm-fixed price construction requirement. Offerors shall furnish all labor, material, transportation, required engineering services, overhead, and profit to Renovate the Intensive Care Unit (ICU) located VA San Francisco Healthcare System (VASFHCS), per the Statement of Work (SOW), specifications, and drawings. C. This requirement is a total set-aside for all eligible Service-Disabled Veteran Owned Small Business (SDOVSB). D. Project completion date is 420 calendar days after the Notice to Proceed (NTP) is issued. E. Place of performance is at VA San Francisco Healthcare System (VASFHCS), 4150 Clement St, San Francisco, CA 94121. F. An offer guarantee is required in the form of a bid bond, which may be submitted electronically by the proposal due date/time to the Contract Specialist, Christopher Whipple by email at christopher.whipple@va.gov. Note: Performance and payment bonds will be required by the successful offeror within ten (10) days of notice of award. G. The Government intends to award a one (1) firm-fixed priced construction contract without conducting discussions with offerors; however, the Government reserves the right to conduct discussions if later determined to be in the best interest of the Government. The Government may reject any or all offers if such action is in the public interest; and waive informalities and/or minor irregularities in offers received. ALL OFFERORS MUST HAVE CURRENT REGISTRATION ON SAM.GOV AND THE U.S. SMALL BUSINESS ADMINISTRATION (SBA) VETERAN SMALL BUSINESS CERTIFICATION (VETCERT) WEBSITE AS AN CERTIFIED ELIGIBLE SDVOSB PRIOR TO RFP EVALUATION AND PRIOR TO AWARD. H. Questions and/or Requests For Information (RFI) must be submitted using the RFI form attachment and are due No Later Than (NLT) 03-24-2025 at 14:00 P.M. PST. to the Contract Specialist, Christopher Whipple, by email at christopher.whipple@va.gov, and Cc: daniel.jhun@va.gov. I. All certified SDVOSB holders are afforded the opportunity to submit an offer for this RFP. All interested SDVOSB holders shall submit a proposal IAW the instructions and terms as stated in this solicitation. J. A pre-proposal site visit is scheduled IAW the date and time listed in solicitation provision FAR 52.236-27 Alternate I (1995) Site Visit (Construction). Meet up location is outside of Bldg 1 at the flagpole, VASFHCS, 4150 Clement St, San Francisco, CA 94121. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Medical

$20,000,000.00

Public - Federal

Renovation

138

27

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Project Record Documents, Spare Parts, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Automatic Entrances, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Glazing Accessories, Louvers and Vents, Louvers, Door Louvers, Vents, Wall Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceramic Tiling, Paver Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Resilient Tile Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Storage Specialties, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Printers, Foodservice Equipment, Educational and Scientific Equipment, Laboratory Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators, Escalators and Moving Walks, Lifts, Wheelchair Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment, Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Central Dimming Controls, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Transient Voltage Suppression, Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Structured Cabling, Communications Horizontal Cabling, Data Communications, Data Communications Peripheral Data Equipment, Printers, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Healthcare Communications and Monitoring Systems, Nurse Call/Code Blue Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Fill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Derricks, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
116
Bidding Soon
1,908
All Active Projects
919
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

June 9, 2025

img_map_placeholder

4150 Clement St, San Francisco, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

ICU Renovation VA Medical Center San Francisco Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.