EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 2, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Phoenix, Arizona. Completed plans call for the renovation of a transportation facility.

The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the Phoenix Sky Harbor International Airport Terminal 3 North Concourse 2 Processor Improvements project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. This project site is located at Phoenix Sky Harbor International Airport, Terminal 3, 3400 East Sky Harbor Boulevard, Phoenix, Arizona 85034. The estimated construction cost is $125 million. SECTION I - PROJECT DESCRIPTION The City of Phoenix Aviation Department seeks to improve the Terminal Processor at Phoenix Sky Harbor International Terminal 3. The planned project is intended to modify passenger check-in processes, improve baggage handling system (BHS) operations, and provide additional passenger security screening checkpoing (SSCP) capacity. SECTION II - SCOPE OF WORK Due to the various project components, this project may consist of multiple design and construction packages to optimize the delivery. At a minimum the project work may include but not be limited to: A passenger check-in / baggage check operation remote from the Terminal 3 Check-In Lobby to ease demand Transformation of the Terminal 3 Check-In Lobby to assist airline operations and improve passenger processing Reconfiguration of equipment and space at Explosive Detection System to provide Outof-Gauge Baggage Screening and expand Checked Baggage Reconciliation Area buffer Relocation and expansion of outbound baggage handling system manual encode station Addition of outbound baggage make-up carousels along with associated facility enclosure modifications, conveyors and controls at the North and South Concourses Modification of the inbound baggage handling system to provide induction pier with associated conveyors / controls and extend two claim carousels Transition baggage handling system controls to Ethernet Protocol Addition of new passenger security screening checkpoint lanes The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods, and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. The GMP must be submitted in MAG or CSI format or it will not be accepted. Questions. Questions pertaining to this selection process or contract issues should be directed to the Contracts Specialist, Annette Perez at (602) 273-3488 or by email at annette.perez@phoenix.gov. City Rights. The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. PRE-SUBMITTAL MEETING TEAMS INFORMATION: Join from meeting number Meeting number (access code): 217 075 463 827 Meeting password: hu6FB2rA Question Deadline 04/04/2025 Email all questions to: annette.perez@phoenix.gov Reference RFx Number: 6000001761 in your email subject line Or call Annette Perez at: (602) 273-3488

GC Bidding

Transportation Terminals

$125,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
27
Bidding Soon
666
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

August 11, 2025

img_map_placeholder

3400 Sky Hbr Blvd, Phoenix, AZ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ Construction Manager at Risk - Phoenix Sky Harbor International Airport Terminal 3 North Concourse 2 Processor Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.