BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a parking garage in Saint Louis, Missouri. Completed plans call for the renovation of a parking garage; and for site work for a parking garage.

Replace the Roof on DeBaliviere Bus Garage, Phase 1 The provide all labor, materials, tools, equipment, and supervision necessary to complete the installation of the TPO Mechanically Fastened Roofing System including flashings or approved equal as specified by the Roofing Material Manufacturer's specifications for approximately 336,200 Sq. Ft. Supervisor to be onsite at all times during project and coordinate with Metro's Project Manager. 2.1.1 Remove existing flashings at all locations and all roofing material. 2.1.2 Mechanically attach new 1/2 " HD Iso cover board or approved equal over all roof areas. Contractor shall cut PVC membrane minimum every 10'. 2.1.3 Mechanically attach new 60 mil TPO membrane using either in seam securement (max 10' wide sheets) or using Rhinobond attachment or approved equal. 2.1.4 Flash all penetrations and wall as per the TPO Manufacturer's specifications. 2.1.5 New slip counterflashing's and termination bars shall be installed as per the Roofing Manufacturer's specifications. 2.1.6 Disconnect and reconnect of any utilities shall be coordinated with the Building Maintenance Supervisor and Project Manager. 2.1.7 Existing lightning protection system will be removed and reinstalled by a qualified electrician. Wire/bases that are currently fastened through roof system will be reinstalled with adhered bases. The project shall consist of: removal of existing PVC flashings, all sheet metal counterflashings, copings, PVC membrane and insulation down to the existing metal deck for entirety of the roof. Additionally the work will also consist of: installation of new 1/2 " HD Iso or approved equal at all roof areas, new 60 mil minimum TPO membrane mechanically fastened roof, or approved equal, PVC flashings, all sheet metal counterflashings and copings. - Phase 1 of the project will include the roof over the office spaces located to the east and west of the building per the site map provided. MBE (14.7%), WBE (6.9%), DBE (2%)

Post-Bid

Parking Garage

$150,000.00

Public - State/Provincial

Renovation, Site Work

19

10

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
36
Bidding Soon
808
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

img_map_placeholder

Multiple Locations, Saint Louis, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.