BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a residential development in Rock Island, Illinois. Completed plans call for site work for a residential development.

The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located at 3607 9th Street. The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. All questions shall be directed to the Construction Officer at 309-732-2906. General: Patch the front steps with hydraulic cement. The corner of step has been busted off. Remove existing iron railing from the landing. Install 3 metal posts on one side of steps and landing. Install a level railing with balusters between two landing posts. Install a rake railing with balusters matching the landing section. These railings must be factory painted or powered coated. They must be for exterior applications. The handrailing going down the basement steps must be re-secured. The existing brackets have pulled out do to being screwed only to the drywall. Brackets will need to be added to the ones already there. The short section of handrail at the top of the stairs will need to be added and secured to solid backing. Bathroom window will need to be removed and framed in. House wrap and sided. Insulated on the inside. Reverse the swing on the bath room door to an out swing. This will require to redoing the hinges on the jambs, placing them on the outside of jamb. Change out the bathroom lockset to new bathroom/privacy set. Install backing for multiple grab bars s before dry wall patching. Install a rain cap on the chimney over the flue. Remodel permit required. Plumbing: Replumb the cast in the basement to pvc in under the bathroom. This will include new traps and stack. Leaks on the existing fixtures now does not appear to be any structural damage. Pull the toilet and reuse after installing new flange and waste line. Remove existing tub and surround and dispose of. Install a new walk in shower in the place of old tub. Install Delta fixture. Vanity will be untouched unless it needs plumbing work done. Install cleanouts per code. Grab bars shall be installed. Plumbing Permit required. Electrical: Install bath fan / light combo vented to the exterior on a single pull switch. Install a GFCI near the bathroom sink, currently there is no outlet. Co2/ smoke detectors throughout the house installed with a 10-year battery. Electrical permit required. Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet all project objectives. The contractor shall have 30 days to complete the work from the date of contract signing. Change work orders over the course of the project are strongly discouraged.

Award

Residential Subdivision

$12,127.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
44
Bidding Soon
572
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 21, 2024

img_map_placeholder

3607 9th St, Rock Island, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.