Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 21, 2024 at 8:00 PM
Updated November 20, 2024
This is a service / maintenance or supply contract in Rockledge, Florida. Contact the soliciting agency for additional information.
Counties: Brevard, Broward, Hillsborough, Lake, Miami-dade, Orange, Osceola, Polk, Seminole, Sumter, Turnpike Road Name: Wildflower Installation and Maintenance Limits: Midpoint Project(s): 19077865212(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Days: 365 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 Please read the full advertisement Description: The work specified in this contract consists of providing all labor, materials, equipment and incidentals necessary to prepare, plant and maintain various wildflower areas along Florida's Turnpike. Work will be geographically open to the entire Florida Turnpike System which includes Florida's Turnpike mainline (SR 91), the Homestead Extension of Florida's Turnpike (HEFT) (SR 821), Sawgrass Expressway (SR 869), Veterans Expressway (SR 589), Beachline West Expressway (SR 528), Suncoast Parkway (SR 589), Polk Parkway (SR 570), Seminole Expressway (SR 417), Western Beltway (SR 429), East-West Expressway (SR 408), Beachline East Expressway (SR 528), Challenger Memorial Parkway (SR 407), First Coast Expressway (SR 23) from Interstate I-10 to SR 21 Blanding Boulevard, and Southern Connector (SR 417). Question Deadline 11/12/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 - Wildflower Installation & Maintenance - Various
Post-Bid
Roads / Highways
$325,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2024
November 29, 2024
Multiple Locations, Rockledge, FL
Related To This Project
Rockledge, FL
Bid Date: Dec 19 2024
Rockledge, FL
Bid Date: Nov 26 2024
Rockledge, FL
Bid Date: Jan 06 2025
Rockledge, FL
Bid Date: Dec 12 2024
Rockledge, FL
--
Rockledge, FL
Bid Date: Jan 08 2025
Rockledge, FL
Bid Date: Jan 14 2025
Rockledge, FL
Bid Date: Jan 23 2025
Rockledge, FL
Bid Date: Dec 05 2024
Rockledge, FL
Bid Date: Nov 26 2024
Rockledge, FL
Bid Date: Nov 04 2024
Rockledge, FL
Bid Date: Nov 26 2024
Rockledge, FL
--
Rockledge, FL
--
Rockledge, FL
Bid Date: Nov 14 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
