BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2024 at 7:00 PM

Updated December 24, 2024

Site work and paving for a civil project in Pontiac, Michigan. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Reference Number 0000366138 This project includes storm system rehabilitation in several sections in the City of Pontiac. The rehabilitation includes cleaning and televising, as well as structural cured-in-place pipe lining of approximately 354 lineal feet of storm sewer consisting primarily of reinforced concrete pipe and corrugated metal with Asphalt coating, ranging from 12-inch to 15-inch diameter. This project also involves the internal sewer spot lining of approximately 48 lineal feet, ranging from 12-inch to 42-inch diameter. As part of this project, 6 storm structures will be removed and replaced. Overall, pavement repair, soil erosion control measures, site restoration, traffic control, and an audio-video route survey will also be required. The party to whom the Contract is awarded will be required to execute the Agreement and obtain the Performance Bond, Labor and Material Bond and Maintenance and Guarantee Bond and shall provide proofs of insurance coverage in accordance with the Contract Documents within ten (10) calendar days of the delivery date of the Notice of Award to the successful Bidder. The necessary Agreement and Bond forms shall accompany the Notice of Award. If the Contractor awarded the project fails to execute the Agreement, submit the Performance Bond, Labor and Material Bond and Maintenance and Guarantee Bond and provide proof of insurance coverage in accordance with the Contract Documents within ten (10) calendar days of the delivery date of the Notice of Award, Owner may declare the Contractor in default, in which case the Bid Bond accompanying the Bid will be forfeited to Owner. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % -- A certified check, cashier's check, or Bid Bond for a sum not less than five percent (5%) of the amount of the proposal will be required for each proposal. Question Acceptance Deadline 11/04/2024 04:00 PM EST Questions are submitted online Yes *Owner reserves the right to accept any proposal, to reject any proposal and to waive irregularities in the proposals. Contractor agrees to achieve Substantial Completion of the Work by MAY 31, 2025, and Final Completion of the Work by JULY 31, 2025

Bid Results

Water / Sewer

$454,588.00

Public - County

Paving, Site Work

17

19

10

5

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
540
Active Projects
333
Bidding Soon
2,453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 12, 2024

Project location map

Multiple Locations, Pontiac, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.