BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Kingston, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000280730 Question Acceptance Deadline 2024/11/08 02:00:00 PM EST Bid Intent Deadline 2024/10/28 02:00:00 PM EDT Scope of Work: 1 the Intent of This Project is to Complete an Intrusive Structural Assessment of the Existing Basement Foundation Masonry Walls as Recommended in the Kingston Provincial Campus Structural Study 2020 (Attached in Appendix E). 2 the Study Identified Extremely Poor Conditions of the Existing Masonry Walls in the Basement, but Intrusive Assessment Was Not Part of Their Study. 3 Consultant to Undertake Destructive Investigation/research in Three (3) Areas of the Foundation Wall. 4 the Study Will Involve the Use of Destructive Testing (Excavation, Coring, Sampling, Etc.). Walls Shall Be Exposed on Both the Interior and Exterior to the Footings. 5 the Completed Study Should Identify Deficiencies, Provide Life Expectancies of Each Structural System, Provide Options and Recommendations for Future Repairs/replacements, and Respective Cost Estimates. 6 Consultant Shall Provide a Report Detailing the Existing Interior Basement Walls Including All Its Related Equipment/components, Its Condition, and Recommend Optimal Mitigation Strategy (Renewal) Options That Will Align With the 10-year Capital Plan. 7 Recommendations Shall Include Class D Estimates for Optional Repair/renewal of the System in Accordance With Io Design Guidelines. Budgetary Cost Will Be Itemized in the Report. 8 Consultant Shall Complete the Recommended Needs Template (Rnt) Including Uniformat, Project Name, Estimated Cost, Priority (P1-p5) and Delivery Year. 230248-274561 - Study - Interior Walls – Mnr Vehicle Garage, 46 Heakes Lane: Scope of Work: 1 the Intent of This Project is to Complete an Intrusive Structural Investigation of the Interior Side of the Exterior Walls and Other Interior Partitions as Recommended in the Kingston Provincial Campus Structural Study 2020 (Attached in Appendix E). 2 the Study Recommended Removal of Interior Wall Finishes, Inspect and Shore Critical Areas Well as Further Intrusive Investigations Into the Underlying Cause of the Issues at the Exterior and Interior Partitions. Study Has Noted the Following Deficiencies: Large, Round Hole Through the Stone Façade on the South Face of the Building; Significant Damages to Internal Wall Plaster; and Heavy Damage to the Exterior Wall Located Around the South Facing Entrance (Man Door) 3the Study Will Involve the Use of Destructive Testing (Excavation, Coring, Sampling, Etc.).? the Completed Study Should Identify Deficiencies, Provide Life Expectancies of Each Structural System, Provide Options and Recommendations for Future Repairs/replacement and Respective Cost Estimates. 4 Consultant Shall Provide a Report Detailing the Existing Walls Including All Its Related Equipment/components, Its Condition, and Recommend Optimal Mitigation Strategy (Renewal) Options That Will Align With the 10-year Capital Plan. 5 Recommendations Shall Include Class D Estimates for Optional Repair/renewal of the System in Accordance With Io Design Guidelines. Budgetary Cost Will Be Itemized in the Report. 6 Consultant Shall Complete the Recommended Needs Template (Rnt) Including Uniformat, Project Name, Estimated Cost, Priority (P1-p5) and Delivery Year Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Educational

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
26
Bidding Soon
516
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

img_map_placeholder

46 Heakes Ln, Kingston, ON

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.