BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Cortez, Colorado. Completed plans call for the renovation of a educational facility.

Project Scope is as Follows but is Not Limited to Items Below - Remove Underground Conductors and Abandon Underground Conduit. Return Salvage to Owner. - Provide New Underground Conduit and Conductors. Complete All Trenching And Backfill Per Utility Standards and Standard Trenching Detail. - Remove Old Meter. Provide New 3-phase Meter. Provide Two New Nema 3r 42 Circuit Panels With Feed Thru Lugs. - Remove Existing Panel. Extend Existing Circuits to New Panel. - End of Existing Three Phase Utility Power. Coordinate With Utility Company to Extend Existing Three Phase Power to New Pole. -add New Led Light and Pole by Fuel Tanks - Keeping Existing Single Phase Compressor With Added Buck Booster. Provide New Circuit for New Compressor as Shown. -add Two Buck Booster Transformer for Each Compressor - Existing Single Phase Panel and Meter Serving the Bus Parking Area to Remain. - Coordinate Approximate Location of New Power Pole and 120/208v Utility Transformer With Empire Electric. This Does Not Include Any Trenching. You Will Be Required to Provide a Small 4' Deep Trench, Hole for Transformer Vault and 2' Deep Trench to 3 Phase Meter Location Near the Pole . - Provide Two 2-inch Conduits With Pull Strings for Future Car Chargers. - Provide One 1 Inch Conduit for Card Reader Data Raceway at Service Pump. Coordinate With Owner for Exact Location of Added Card Reader. - Existing Gas Pump Emergency Power Off Button to Remain. - Conduits for Future Car Chargers to Terminate in Grade Level Box. Provide 18"X24" Grade Level Box. - Provide New Feeder and Disconnect for Existing Compressor. Refer to Mechanical Equipment Schedule. - Provide New Circuit for Weatherproof Gfci Receptacle Per Design. -all Construction Trash and Debris Will Need to Be Disposed of by the Contractor on a Daily Basis and Will Use the Re-1 Dumpsters Only With Permission of the Transportation Director. The following are requirements of this Proposal: (However, may in no way constitute all documents required for this Proposal) o RFP Response Form o Insurance Certificates - Within 10 Calendar Days of Award Notification o Performance & Payment Bonds required for projects in excess of $50,000 *For Technical Questions Regarding This Solicitation, Please Contact Melisa Jeter at 970-564-4843 Email - mjeter@cortez.k12.co.us

Post-Bid

Educational

$1,840,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
66
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

January 13, 2025

img_map_placeholder

9049 Co Rd 27, Cortez, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.