BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Outdoor lighting and renovation of a transportation facility in Auburn, California. Completed plans call for the renovation of a transportation facility; and for outdoor lighting for a transportation facility.

The Construction Services in support of ARN - Platform Light Pole Replacement. Responses are to include qualification information requested/stated below and be limited to ten (10) one-sided typed pages. Amtrak, at its sole discretion and without discussion, will determine which Contractors are to be added to its short list for the forthcoming Invitation to Bid. Description: WORK COVERED BY CONTRACT DOCUMENTS This project consists of platform lighting upgrades at Auburn, CA (ARN) Station to enhance Amtrak's assets, provide positive customer service and experience, and improve safety and security for customers and Amtrak employees. *Please review the attached Scope for additional details. The scope of work for this project consists of: Install two new platform light poles, in-kind. Remove and dispose light pole that was knocked over and is on the ground. See Appendix A for Existing Conditions See Appendix B for Amtrak Electrical Standard Design Practices. Indicate in the bid, then number of days of flagging needed to complete the track work in this project 1. SHPO and NEPA review/coordination is required prior to Notice to Proceed (NTP). Process will be completed by Amtrak's Project Manager. 2. Contractor's fee proposal must be approved by Amtrak prior to commence any work. The proposal shall also include period of performance - start/end dates - from NTP date. 3. No work shall commence, nor material procured, until NTP is provided to the contractor by Amtrak. 4. Contractor to provide product information for Amtrak's review and approval. 5. The contractor shall notify Amtrak of anticipated changes to the schedule within a reasonable time frame, not to exceed 2 days. The contractor shall submit and obtain approvals for changes to the project schedule and/or budget. 6. All work must be coordinated with the station staff to minimize daily operations disturbance Statement of Qualifications: Firms shall provide the following: o Name of Firm (if a single entity) or Joint Venture Partners and significant subcontractors. o The Name, Title, and Contact information of the Authorized Representative / Single Point-of-Contact for the LOI. o Presentation of resume / qualifications of Project Manager(s) demonstrating successful management of general construction projects. o Demonstration of the firm's successful experience in construction / rehabilitation projects over the past 10 years. Please show examples of similar projects with the scope of work, type and percent of contract self-performed, contract amount, schedule duration and Contact name and phone number. o Demonstration that the firm has adequate resources for the construction project. o Please limit total LOI submissions to 10 pages. If you are currently not registered as a current Amtrak supplier, please include a copy of your W9. Important Note: The information contained herein may not be reissued or redistributed in any form or manner in whole or in part without the advanced expressed written consent and permission of Amtrak

Post-Bid

Transportation Terminals

$2,000,000.00

Public - Federal

Outdoor Lighting, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
65
Bidding Soon
1,039
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 30, 2024

img_map_placeholder

Multiple Locations, Auburn, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.