BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Barrington, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project will include but not limited to: Rejuvenator material to existing asphalt. This project is to be bid as a lump sum contract with supplemental unit prices. LOCATION OF THE WORK: Barrington High School, Grove Avenue Elementary School, North Barrington Elementary School and Sunny Hill Elementary School under School District 220 authority within the Villages of Barrington, North Barrington, and Carpentersville in Cook, Lake and Kane County. PREQUALIFICATION OF BIDDERS: All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. WAGES OF EMPLOYEES:Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. REJECTION OF BIDS: The Owner reserves the right to reject any and all bids and bidders and to waive technicalities. BID SECURITY: Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Barrington Community Unit School District 220 shall accompany the bid. CONSTRUCTION SCHEDULE: All Rejuvenator work shall be completed during the weekend (starting Thursday and re-opening parking lot Sunday night). The Contractor shall begin the work to be performed under the contract after Monday, June 2, 2025. The Contractor shall be substantially complete by Friday, August 8, 2025 and final completion by Friday, August 15, 2025. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with Article 108.09 of the Standard Specifications or other applicable BDE Special Provisions shall apply. Doc Notes: On October 30, 2024 after 9:00 A.M., Bid Packets may be obtained from the Engineer's website at online. The download cost for this project is $27.00. Please contact online for assistance in free membership registration, downloading, and working with this digital information. Question Deadline 11/15/2024 Questions will be accepted up to 72 hours in advance of the bid opening time. Any questions received closer to the bid opening will not be answered.

Post-Bid

Roads / Highways

$370,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
103
Bidding Soon
2,142
All Active Projects
915
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

June 2, 2025

img_map_placeholder

Multiple Locations, Barrington, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.