BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2024 at 7:00 PM

Updated November 27, 2024

Site work and paving for a mixed-use development in West Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work being completed on S. 38th Street and W. Grant Street is being partially funded by WisDOT through the Local Roads Improvement Program (LRIP) using MSILT funds. The work generally consists of the following: Restoration 1 LS, Traffic Control1 LS, Erosion and Dust Control 1 LS, Sanitary Manhole Adjustment - 2 EA, Storm Manhole Adjustment - 4 EA, Storm Structure Removal - 2 EA, Storm Inlet Rehabilitation 2 EA, Storm Catch Basin (File No. 25) - 3 EA, Storm Manhole (4' Dia.) - 2 EA, 12" Dia. RCP Storm Sewer Class V Slurry Back- fill 41 LF, 6" Dia. PVC Storm Sewer - SDR 35-Slurry Backfill-4 LF, Valve Adjustments-7 EA, Pavement Sawing - 2,050 LF, Milling Pavement - 2,575 SY, Cracked and Seated Pavement - 2,555 SY, Concrete Walk Removal 4,542 SF, Driveway Pavement Removal 4,429 SF, Concrete Curb & Gutter Removal -1,480 LF, Pavement Removal/Excavation/Grading 836 CY, Dense Graded Base (3/4") 656 , 31" Concrete Curb & Gutter 1,486 LF, 5" Concrete Sidewalk 5,320 SF, 7" Concrete Drive- way 424 SY, Bit. Concrete Surface (4 LT 58-28 S)367 TON, Bit. Concrete Binder (3 LT 58-28 S) - 844 Bids shall be accompanied by Bid Security in the form of a bid Bond, certified check, or cashier's check made payable to the Village of Butler in an amount of 5 percent (5%) of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 10 days after the Award, the Check or Bid Bond shall be forfeited to the Village as liquidated damages. Bids shall be submitted on the bid form provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. The Village reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non- responsive, unbalanced or conditional Bids and the right to accept the Bid and Bids which best serve the interests of the Village.

Award

Roads / Highways

$399,228.00

Public - City

Paving, Site Work

17

13

5

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
127
Bidding Soon
2,248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

December 6, 2024

Project location map

Multiple Locations, West Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.