Site work and new construction of a transportation facility in Sarasota, Florida. Completed plans call for the construction of a 6,000-square-foot transportation facility.
Plans call for the new ground up construction of a customs facility. SRQ NO.: BID-03-2024-GAFIS (Redesign) SMAA PROJECT NO. BID-07-2022-GAFIS FDOT PROJECT NO. 450535-1-94-01 C&S PROJECT NO. X60.001.002 Note from Magnum Builders: MBE/WBE/DBE/Veteran Owned/DVBE Participation Encouraged The new GA FIS Facility Project generally involves the construction of an approximately 6,000sf GA Customs Facility in alignment with the current version of the General Aviation Facilities Design Guide. Davis Bacon Prevailing Wage Project The customsfacility shall include office space, administration space, commons area, toilet/restroom facilities, screening and waiting areas, and required CBP equipment. Project also includes the design of an HVAC heating and cooling system, electrical power and lighting systems with emergency backup, low voltage security and communications systems with interconnectivity to the main Terminal CBP FIS, and life safety systems as required for the new FIS Customs Facility. In addition, project involves constructing a new taxiway and ramp, site work for a parking lot and surrounding grade tie-ins including the extension of existing utilities such as electricity, gas, water, sewer, cable, and data/telephone. All questions about the meaning or intent of the Contract Documents shall be submitted to Elisa Traub,Project Manager 1(elisa.traub@flysrq.com)inwriting. Replies,whenconsidered necessary by the SMAA, will be issued by Addenda, mailed or delivered to all parties recorded by SMAA as having received the Bidding Documents. Sarasota Manatee Airport Authority ATTN: Elisa Traub 6000 Airport Circle Sarasota, FL 34243 Questions received after Monday, September 30, 2024 at 5:00 pm (EST) will not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Phase "1": Includes construction of all the work east of Taxiway C and west of the access road alongTaxiway K. This work will require closure of Taxiway K between Taxiway C and the FIS facility. There will be no impacts to NAVAIDs during this phase. However, the Taxiway K edge lights in the closed area will be disconnected, jumpered or covered and the signs to that portion of Taxiway K will be covered. Lighted barricades will be installed for the closure of Taxiway K. The Contractor's staging area will be located adjacent to the project site. Phase "2": Includes construction of the fiber home run from the project area to the Airport Terminal. The taxiway and runway crossings shall be installed using directional drilling. The Contractor's staging area will be located adjacent to the project site. The contractor will be required to be escorted for this work. These areas will also be broken into sub areas to allow for smaller areas to be closed down to allow for the construction.
Post-Bid
Transportation Terminals
$3,000,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2024
December 30, 2024
850 Clyde Jones Rd, Sarasota, FL
Related To This Project
Sarasota, FL
--
Sarasota, FL
Bid Date: Nov 26 2024
Sarasota, FL
Bid Date: Nov 01 2024
Sarasota, FL
--
Sarasota, FL
Bid Date: Nov 27 2024
Sarasota, FL
Bid Date: Nov 18 2024
Sarasota, FL
Bid Date: Nov 12 2024
Sarasota, FL
Bid Date: Dec 04 2024
Sarasota, FL
Bid Date: Nov 25 2024
Sarasota, FL
Bid Date: Jul 22 2021
Sarasota, FL
Bid Date: Dec 09 2020
Sarasota, FL
--
Sarasota, FL
Bid Date: Nov 21 2024
Sarasota, FL
Bid Date: Oct 30 2024
Sarasota, FL
Bid Date: Oct 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.