Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, remodeling and addition to a municipal facility in Ada, Oklahoma. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the remodel of a municipal facility; and for site work for a municipal facility.
conference room addition and partial remodel project for the Pontotoc County Specialty Courts Office This work will be performed according to the project specification provided for t his project. The proposal will include a special provision concerning the Contractor's Non Collusion Affidavit and a 5% bid bond in a certified or cashier's check or surety bond shall accompany the sealed proposal of each bid- der. Evidence of having proper worker's compensation coverage for employees as provided by Title 85 of the Oklahoma Statutes Section 61, a warranty bond, and a per-formance bond shall be required before issuance of a work order. Pontotoc County reserves the right to reject any or all bids. Remodel portion: Demo and Remove one Office Wall (TBD) o Cut In a new window on North Wall o Close in one office door (TBD) o Complete all drywall work and painting as needed o Demo and remove VCT tile as needed o Install carpet squares in two offices and a hallway o Complete trim and cove base in affected areas Conference Room Addition (301 X18' conference room and 1Q<< X181 file room) Complete layout for new 40'X18' addition o Relocate existing HVAC units to the south side of the building (All HVAC units to be moved to the East side of the new addition) (will be moved twice) o Remove fencing on the south side o Remove existing deck o Complete dirt work and rough in all plumbing and electric as needed o Complete concrete slab o Complete framing of all walls, roof, and vaulted ceilings (Remove brick on the east wall only as needed to allow forframingtie in) (existing brick wall will be the finished interior wall of conference room) Complete install of all windows, doors, and dry-in structure Complete all exterior brick soffit fascia and roofing to match existing structure Rough in plumbing, electric, and HVAC (To be done per code) (2-ton HVAC unit) (floor outlet in middle of conference room) Insulate walls and ceiling Complete all dry wall, mud work, and light skip trowel texture Complete all painting (Color(s) TBD) Install flooring (TBD) Complete all trim out of doors and windows Install cabinetry and countertops for conference room coffee bar Complete all electrical top out and set fixtures (recessed LED) Complete plumbing and set fixtures for coffee bar sink Complete install of HVAC unit. Placement of Inside unit TBD o Complete all final interior and exterior finishes and touch ups PArking-Complete concrete and striping for 2 parking spots (with parking blocks) and a walk way to side door (will be placed on the south side of new addition)
GC Bidding
Municipal
$160,000.00
Public - County
Addition, Demolition, Remodeling, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2024
December 18, 2024
To Be Determined, Ada, OK
Related To This Project
Ada, OK
Bid Date: Oct 31 2024
Ada, OK
Bid Date: Nov 22 2024
Ada, OK
Bid Date: Dec 05 2024
Ada, OK
Bid Date: Nov 26 2024
Ada, OK
Bid Date: Nov 26 2024
Ada, OK
Bid Date: Nov 08 2024
Ada, OK
Bid Date: Oct 28 2024
Ada, OK
Bid Date: Oct 23 2024
Ada, OK
Bid Date: Sep 20 2024
Ada, OK
Bid Date: Sep 26 2024
Ada, OK
Bid Date: Sep 12 2024
Ada, OK
Bid Date: Sep 26 2024
Ada, OK
Bid Date: Aug 28 2024
Ada, OK
Bid Date: Sep 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.