BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a transportation facility in Olympia, Washington. Completed plans call for the remodel of a transportation facility.

BP 3.0 - Structural Concrete & Rough Carpentry BP 5.0 - Structural Steel & Miscellaneous Details BP 8.0 - Doors & Hardware - Revised BP 8.2 - Overhead Coiling Doors BP 10.0 - Miscellaneous Specialties - Revised BP 11.0 - Equipment This project consists of the demolition of the existing administration building, construction of a permanent storage metal structure, renovation of the existing maintenance building and surrounding site work/ civil upgrades. The project will begin with underground Electrical and Mechanical infrastructure in Phase 1. Next in Phase 2 will be demolishing the existing Administration building in preparation for a newly paved employee parking lot, constructing two new infiltration galleries, and installing a gravity retaining wall at the grade change between the new parking lot and existing entrance. Following this work, in Phase 3 will be construction of the third and final large infiltration gallery, building the metal storage structure, and demolishing/replacing all existing hardscape of the east side bus tarmac. Finally, in Phase 4 we will take over the existing Intercity Transit maintenance building once Intercity Transit moves their maintenance team into the metal storage structure and begin to perform selective demo in preparation for a full remodel (MEP, Structural Upgrades, Interior/Exterior Finishes, Removal/Relocation of existing owner equipment, etc.) as well as replacing North and South existing heavy paving hardscape and associated landscaping. DIRECT ALL QUESTIONS TO AlexC@formacc.com. BONDING Performance and payment bond will be required on all bid amounts over $300,000. A Bid Bond/cashiers check is required in the amount of 5% of the bid amount on bids $300,000 and over (to be submitted along with bid proposal). Construction is expected to begin January 2025.

Sub-Bidding

Transportation Terminals

$38,000,000.00

Public - City

Remodeling

762

76

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
37
Bidding Soon
686
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

January 6, 2025

img_map_placeholder

526 Pattison St SE, Olympia, WA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.