BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bullhead City, Arizona. Completed plans call for site work for a water / sewer project.

This project consists of the removal and replacement of up to 160 feet of 24-inch sewer main located on the east side of Highway 95 North of Merrill Ave and South of Rio Rancho Blvd. The existing sewer main was constructed of 24-inch HDPE and shall be replaced with 24-inch SDR35 PVC. This section of sewer main has been crushed due to infiltration of dirt and rock between the 36-inch ADS sleeve and the 24-inch HDPE. An emergency replacement project was initiated in December 2023 which replaced approximately 103 feet of pipe. A temporary connection was made using a concrete encasement to prevent any sewage loss, and to prevent any further damage to the existing main. This concrete encasement is located approximately 103 feet south of MH-15921 and must be removed to make connection to the existing SDR35 PVC. The pipe replacement for this project will continue from this point to the south, up to 160 feet in length. The end point of this replacement will be determined by the Bullhead City Utilities Department Project Manager. Before starting the replacement of this pipeline, bypass pumping must be installed per the City's bypass pumping requirements and per the bypass pumping plan provided by the contractor. A water main bypass must be installed per plan to reduce the possibility of any water outage during this project. All temporary pipes and fittings must be disinfected during installation per ANSI/AWWA Standard C651-14. A sample port must be installed on the bypass line and a BAC-t test will be collected by the Bullhead City Water Quality Specialist. This Bac-t test must "pass" prior to opening the bypass. The City of Bullhead City will coordinate with Mohave Electric Cooperative (MEC) to deenergize and remove the power lines within this trench-line prior to the start of excavation. The selected contractor will be responsible for preserving this conduit in place; or remove and replace the conduit as needed. The conduit shall be inspected and approved by a MEC inspector prior to backfill. Due to the volume of sewage carried by the nearby sewage lift station and the lift station running on backup power the selected contractor must adhere to a strict schedule allowing no delays throughout the duration of this project. Bids must be in the actual possession of the City Clerk's office on or prior to the exact time and date indicated above. Late bids will not be considered under any circumstances. Bids must be submitted in a sealed opaque envelope with the Project Name and the bidder's name and address clearly indicated on the envelope. All bids must be completed in ink or typewritten on the form contained within the specifications titled Invitation for Bid. For information or to obtain plans, specifications and bid documents or to submit questions concerning the IFB, contact Jackie Renfroe, Administrative Analyst, 2355 Trane Road, Bullhead City, Arizona 86442-5966, at phone (928) 763-9400, ext. 8840, or at jrenfroe@bullheadcityaz.gov. Brief procedural questions may be submitted and responded to informally. Technical questions regarding the substance of this IFB must be submitted in writing or by email and received no later than 2:00 p.m. on November 1, 2024. Questions may then be responded to by written amendment to this document. Oral statements or instructions do not constitute an amendment to the IFB. Only those plan holders registered with the City of Bullhead City will receive any modifications to the plans, specifications and bid documents and any notices that are issued during bidding. The City of Bullhead City reserves the right to accept or reject any or all responses or parts thereto. Bid Bond: 10% Payment Bond: 100% Performance Bond: 100% Project Completion Date: 90 Calendar days or less after Notice to Proceed. Representatives of the Owner will be present. City of Bullhead City reserves the right to accept or reject any or all bids or any part thereof and waive informalities deemed in the best interest of the City. The Owner may, at its option, waive immaterial errors or omissions in bids not prepared and submitted in accordance with the provisions of this Invitation for Bids and/or the requirements of the City's procurement ordinance or, alternatively, may reject any and all bids not prepared and submitted in accordance with the provisions of this Invitation for Bids and/or the requirements of the City's procurement ordinance. Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be considered. No bidder may withdraw a Bid within 90 calendar days after the actual date of the opening thereof. BID SECURITY Each bid must be accompanied by a bid bond in the form of a certified or cashier's check made payable to the Owner in an amount equal to ten percent (10%) of the bid submitted, or alternatively, through a surety bond issued in the form substantially similar to the one attached to these bid documents or on another form approved by the Owner in the amount of ten percent (10%) of the amount of the bid submitted that conforms with the requirements of 34-201, Arizona Revised Statutes (A.R.S.).

GC Bidding

Water / Sewer

$400,000.00

Public - City

Site Work

6

5

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
9
Bidding Soon
379
All Active Projects
128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

img_map_placeholder

Multiple Locations, Bullhead City, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.