BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Framingham, Massachusetts. Conceptual plans call for site work for a water / sewer project.

Upgrading 5,000 feet of existing 6-inch cast iron and 8-inch asbestos-cement water main on Pleasant Street and Temple Street with new 12 cement-lined ductile iron main will improve flow capacity and substantially increase reliability of the water system. This request is for construction on Pleasant St. from just west of Belknap Rd. to Vernon St. and on Temple St. from Pleasant St. to the I-90. The project will also include new connections to side streets, valves, hydrants, and copper services to each customers property line. The existing water mains are more than 7 decades old. The 8-inch main on Pleasant Street is beneath the curb and difficult to access for repairs. The 6-inch diameter cast iron main on Temple Street is unlined, which has led to interior tuberculation and corrosion causing decreased capacity. The construction is proposed to be combined with construction to replace sewers in the area, resulting in lower construction costs and much less disruption to the neighborhood and commuters in this busy corridor than if the projects were to be undertaken separately. As of October 28, 2024, This project is included in the city's 2025-2034 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$4,190,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
224
Bidding Soon
3,108
All Active Projects
1,412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

img_map_placeholder

Temple St & Pleasant St, Framingham, MA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.