BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Site work for a water / sewer project in Framingham, Massachusetts. Conceptual plans call for site work for a water / sewer project.

Update:Worcester Road Water Mains Phase II Project is included in City of Framingham Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The project is for replacement and upgrading of approximately 2,750 feet of old 6-inch diameter cast iron water main infrastructure on Worcester Road (Route 9) Westbound between Concord Street and Caldor Road. Replacement includes new domestic and fire service connections to all businesses within the project area. This infrastructure is in poor condition and is between 50 and 120 years old, exceeding its service life and highly likely to fail due to the outdated material (cast iron). Even though some of the pipe was installed as recently as 1968, cast iron pipe produced in the 1950s and 1960s has been a major source of main breaks not only in Framingham but in utilities throughout the US. This water infrastructure serves major portions of Framinghams retail businesses, where emergency repairs and traffic disruption would be significantly expensive because of its location within state road limits. This project will improve water infrastructure in the area by increasing capacity for future demands, enhancing reliability of the system, improving fire flows and water quality, and reducing maintenance costs. This project is also an opportunity to address water and sewer needs together as part of a single construction package, resulting in reduced impacts to the businesses in the area and those who travel on this busy roadway.The project is for replacement and upgrading of approximately 2,750 feet of old 6-inch diameter cast iron water main infrastructure on Worcester Road (Route 9) Westbound between Concord Street and Caldor Road. Replacement includes new domestic and fire service connections to all businesses within the project area. This infrastructure is in poor condition and is between 50 and 120 years old, exceeding its service life and highly likely to fail due to the outdated material (cast iron). Even though some of the pipe was installed as recently as 1968, cast iron pipe produced in the 1950s and 1960s has been a major source of main breaks not only in Framingham but in utilities throughout the US. This water infrastructure serves major portions of Framinghams retail businesses, where emergency repairs and traffic disruption would be significantly expensive because of its location within state road limits. This project will improve water infrastructure in the area by increasing capacity for future demands, enhancing reliability of the system, improving fire flows and water quality, and reducing maintenance costs. This project is also an opportunity to address water and sewer needs together as part of a single construction package, resulting in reduced impacts to the businesses in the area and those who travel on this busy roadway. As of October 28, 2024, This project is included in the city's 2025-2034 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$4,080,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
573
Active Projects
263
Bidding Soon
4,090
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

Worcester Rd, Framingham, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.