BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition and site work for a residential development in Jefferson City, Missouri. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Project Description: The City of Jefferson, herein referred to as City, invites interested, qualified vendors, hereinafter referred to as contractors or bidders, capable of providing the required services, to submit bids to provide demolition services at 212 Jackson Street in Jefferson City, MO. Question Deadline 11/15/2024 at 4:00 PM CT Questions regarding the prebid conference or bid specifications must be directed to Leigh Ann Corrigan. Purchasing Agent: Leigh Ann Corrigan LCorrigan@jeffersoncitymo.gov 573-634-6325 Scope of Work A. Contractor shall provide all labor, materials, supplies, equipment, and incidentals needed to perform demolition services of the above listed structures. B. Contractor shall complete and submit a demolition permit application to the City (including a plan for erosion control if needed) for review and approval. o Contractors are responsible for submitting and paying the city demolition permit fee. The fee is $100.00. Contractor shall comply with all terms and requirements of 6 the permit and hold the City of Jefferson harmless for failure to do so. The demolition permit may be found o MDNR must be contacted by the successful bidder before work begins. Contractor shall provide documentation to the City's Building Official. Asbestos inspection and asbestos abatement have previously been completed. o Lot shall be cleared of all rubbish and all unsafe or hazardous conditions which endanger the life or health of the public C. All utilities (gas, electric, water, and sewer) shall be disconnected and removed from the structure in accordance with utility company standards before work is started. Documentation of utility sign-offs shall be provided to the City's Building Official. No cutting of any City street is allowed without prior Public Works permission. See Exhibit 3 for the application for street cut. D. Sewer lateral shall be disconnected and plugged at the main by a Jefferson City licensed plumbing contractor. The contractor shall contact the Plumbing Inspector when the sewer lateral is plugged for verification. E. Water service line shall be disconnected and plugged at the tap/main by a Jefferson City licensed plumbing contractor. The contractor shall contact the water utility and the Plumbing Inspector when the water service is plugged for verification. F. It is the sole responsibility of the contractor to obtain releases from all utility companies serving the structure(s) stating that their respective service connections and appurtenant equipment have been removed or sealed and plugged in a safe and acceptable manner. G. Contractor shall completely remove and dispose of the structure and all debris and other trash items on the lot. The contractor shall abide by the City's exclusive rights solid waste contract with Republic Services. Removal and disposal shall be in accordance with MDNR regulation, Chapter 260, RSMO. H. All exposed concrete flatwork, stone and asphalt shall be removed. The foundation and the basement slab will need to be destroyed entirely prior to fill. Foundation walls must be removed to a minimum of 1' under finished grade. I. The basement shall be filled with material that can be consolidated. This may be well graded base rock or gravel screenings or other suitable material that can be "walked in" or consolidated by other methods (the driveway asphalt in less than 6-inch cubes may be used if worked into the other backfill). The contractor shall not allow wood, brick, shingles, organic or other demolition material from the structure to be used as fill for the basement. Proposed fill material other than that listed for backfilling shall be submitted for approval no less than five (5) working days prior to receipt of bids. Call the Building Official for inspection prior to backfilling the basement.

Award

Residential Subdivision

$9,960.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
28
Bidding Soon
368
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

img_map_placeholder

212 Jackson St, Jefferson City, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.