BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated January 8, 2025

Site work for a water / sewer project in Jefferson City, Missouri. Completed plans call for site work for a water / sewer project.

The proposed work for the project entitled "Project No. 31203, Partnership Parkway Aerial Sewer Crossing Replacement" will include the furnishing of all material, labor, and equipment to install aerial pipe crossing including piles, concrete work and 12-inch sanitary sewer main. The contract will require compliancewith the wage and labor requirements and the payment of minimum wages in accordance with the Schedule of Wage Rates established by the Missouri Division of Labor Standards. The City reserves the right to reject any and all bids and to waive informalities therein, to determine which is the lowest and best bid and to approve the bond. Any questions that arise as a result of this advertisement should be directed to the City of Jefferson Department of Public Works at (573) 634-6410. Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Questions Due Date: Dec 5th 2024, 4:00 PM CST Work zone traffic management supplied by the contractor shall be in accordance with applicable portions of Division 100 and Division 600 of the Missouri Standard Specifications for Highway Construction, and applicable portions of City of Jefferson Technical Specifications. Traffic control on this project is expected to be minor, and the Contractor shall supply the Engineer and Owner with a project site access plan that indicates any required traffic control measures prior to beginning work. A detailed traffic control plan is not required; however, any traffic control devices used shall meet MUTCD requirements. Any work associated with traffic control is fully incidental to other bid items and will not be paid directly. This project consists of grading, longitudinal peak stone toe protection (LPSTP) structure of rip rap, installation of rock blanket, installation of an aerial sewer crossing with pipe support structures, seeding/mulching, and erosion control BMPs required for the replacement of a failed aerial sewer crossing just east of Militia Drive and South of Partnership Parkway.

Award

Water / Sewer

$271,868.00

Public - City

Site Work

10

18

2

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
47
Bidding Soon
480
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

January 9, 2025

Project location map

Partnership Pkwy, Jefferson City, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.