BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Elkhart Lake, Wisconsin. Completed plans call for site work for a water / sewer project.

DPW Building Water Main Relay The project is located at the proposed Village of Elkhart Lake Department of Public Works building, to be constructed on a parcel at the intersection of East St and Maple St in Elkhart Lake, WI. An estimated amount of the major work items for the above contract includes: Install 327 LF of PVC Water Main 8-Inch, and 12 LF of PVC Watermain 4-Inch, and 2 EACH Gate Valve and Valve Box 8-Inch. Install 375 LF of Silt Fence. Disconnect and Abandon 6" Water Main. All Bids shall be accompanied by Bid Security in the form of a Bid Bond, payable to the Village of Elkhart Lake, in the amount equal to five percent of the bid. Bidders may not withdraw their bid within the 90-day period after the date of the bid opening. The Owner reserves the right to reject any or all bids, waive or not waive any informality in the bids received and to accept any bid, which they deem most favorable to the interests of the Owner. Question Deadline 11/08/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered . The Work shall commence on or after December 2, 2024 ; Final completion- April 11, 2025.

Bid Results

Water / Sewer

$50,330.00

Public - City

Site Work

10

14

4

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
29
Bidding Soon
669
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2024

December 2, 2024

img_map_placeholder

East St & Maple St, Elkhart Lake, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.